Basketball Court Concrete Calculator

Quick answer

A basketball court concrete calculator works out the concrete for a court slab. Pick the court size, from a full 94 by 50 foot court to a half court or a custom pad, set the thickness, and it finds the volume. A full court at 4 inches needs about 63.8 cubic yards of concrete with 10 percent waste.

Try
Concrete and Cement
Pick a standard court or Custom. NBA and college are 94 x 50 ft, high school 84 x 50, junior high 74 x 42, an NBA half court 47 x 50.
ft
Length in feet. Used only for a Custom court; standard sizes are set by the court choice.
ft
Width in feet. Used only for a Custom court.
in
Thickness in inches. 4 in is common for an outdoor sport slab; thicker for heavy use. Follow your plans.
%
Extra concrete for an uneven sub-base and spillage. 5 to 10 percent is typical.
Used only to show a bag count. A court is far too large to bag; order ready-mix. Yields 0.60 cu ft per 80 lb bag, 0.45 per 60 lb, 0.30 per 40 lb.

Concrete needed

—
Cubic feet—
Truck loads (10 cu yd)—
Weight (short tons)—
Court area—

Calculations run in your browser. Inputs are not sent to our servers; anything you Save stays in this browser only.

Saved results (0)

How to Use the Basketball Court Concrete Calculator

  1. Pick the court size: full, high school, junior high, half court, or Custom.
  2. For a Custom court, enter the length and width in feet; standard sizes are set for you.
  3. Set the thickness in inches and a 5 to 10 percent waste allowance.
  4. Read the result: cubic yards to order, the ready-mix truck loads, the weight and the area.

Here is what each result line means:

ResultWhat it means
Concrete neededTotal volume in cubic yards, including waste. The ordering number.
Cubic feetThe same volume in cubic feet.
Truck loadsReady-mix loads at about 10 cubic yards each, rounded up.
Court areaThe slab area in square feet, for the sub-base, finishing and striping.

What Is a Basketball Court Concrete Calculator?

A basketball court concrete calculator estimates the concrete for a court slab from the court size and thickness. A court is a large flat pour, so the main question is how many cubic yards and how many truck loads it takes.

Standard courts are set sizes: an NBA or college court is 94 by 50 feet, a high school court 84 by 50, a junior high court about 74 by 42, and an NBA half court 47 by 50. The tool uses those dimensions, or your own for a home or custom pad, and works out the concrete. For the mix itself, use the concrete mix calculator or the cement calculator, and for mix water the water cement ratio calculator.

How the Basketball Court Concrete Calculator Works

Court concrete (cubic yards)
V = areaT27(1 + w)

A court is a rectangle, so the volume is the area times the thickness, divided by 27 for cubic yards. The court size sets the area, and the thickness and waste do the rest.

  1. Take the court area, length times width, from the chosen size or your custom dimensions.
  2. Multiply by the thickness in feet for the volume in cubic feet, then add the waste allowance.
  3. Divide by 27 for cubic yards, and by about 10 for the ready-mix truck loads.

Basketball Court Concrete Example

Suppose you are pouring a full court, 94 by 50 feet, at 4 inches, with 10 percent waste.

Worked example: full court 94 x 50 ft at 4 in, 10% waste
V = 47000.333271.10 = 63.83

Calculation: the area is 94 x 50 = 4,700 sq ft. Volume = 4,700 x 0.333 = 1,566.7 cu ft, or 58 cu yd. Adding 10 percent waste gives 1,723 cu ft, which is 63.83 cu yd, about 7 ready-mix truck loads and roughly 129 short tons.

The lesson: a full court is a major pour of over 60 cubic yards. It is strictly a ready-mix job, and placing it in one go takes planning and a full finishing crew.

Factors That Change How Much a Court Needs

Court Size

The size sets the area, and the area drives everything. A full court is more than double a half court, and a junior high court is smaller again.

Thickness

Thickness multiplies the whole area, so an extra inch across a court is a lot of concrete. Four inches suits most outdoor play; heavier use or vehicles need more.

Sub-base and Drainage

A court needs a compacted, well-drained sub-base and a slight slope to shed water. A soft or uneven base soaks up concrete, which the waste allowance covers.

Control Joints and Reinforcement

A slab this large must be jointed and usually reinforced to control cracking. These do not change the volume but are essential to the build.

Standard Court Sizes vs Custom

Most home courts are smaller than a regulation court, scaled to the space and budget. The tool offers the standard sizes and a custom option so you can compare.

CourtSizeArea
Full (NBA / college)94 x 50 ft4,700 sq ft
High school84 x 50 ft4,200 sq ft
Junior high74 x 42 ft3,108 sq ft
Half court (NBA)47 x 50 ft2,350 sq ft

A backyard court is often a custom pad, perhaps 30 by 50 feet or less. Choose Custom and enter your own size to compare the concrete each takes.

When to Use a Basketball Court Concrete Calculator

Planning a Court Pour

Size the concrete in cubic yards and truck loads before you order, so the big continuous pour is scheduled and crewed.

Comparing Court Sizes

Weigh a full court against a half or a custom pad to see what fits the space and the budget.

Budgeting the Slab

Use the cubic yards with a price per yard to get a material figure before adding the base, finishing and the hoop.

Common Mistakes When Estimating a Court

1. Forgetting the Sub-base

A court slab sits on a compacted, drained base. The concrete estimate does not include that stone layer; size it separately.

2. Under-crewing the Pour

Over 60 cubic yards placed in one go needs a full finishing crew. A court is not a weekend solo pour.

3. Skipping Control Joints

A slab this size cracks without planned joints. They do not change the volume but must be in the plan.

4. Using the Wrong Court Size

A high school court is shorter than a full court, and a junior high court is smaller again. Pick the right size or enter custom dimensions.

5. Forgetting a Waste Allowance

An uneven base over a large area soaks up concrete. Keep 5 to 10 percent so the pour does not run short.

Accuracy and Limitations

The arithmetic is exact and the standard court sizes are the published dimensions; the result depends on the thickness and the waste you enter.

What it calculates accurately

  • Court volume in cubic yards and cubic feet for the size and thickness entered
  • Ready-mix truck loads and the slab weight
  • The court area for standard or custom sizes

What it does not account for

  • The compacted sub-base under the slab
  • Reinforcement, control joints, drainage slope or finishing
  • Run-off margins and out-of-bounds aprons beyond the court itself
  • Delivery, short-load fees and taxes

How We Calculate Your Court Concrete

Method
Court area (length x width) times thickness in feet, plus waste, divided by 27 for cubic yards; cubic yards divided by 10 for truck loads.
Inputs used
Court size (standard or custom), thickness, waste percentage and bag size.
Court sizes
Full (NBA / college) 94 x 50 ft, high school 84 x 50, junior high 74 x 42, NBA half court 47 x 50.
Conversions
1 cubic yard = 27 cubic feet; 1 foot = 12 inches.
Weight
150 lb per cubic foot for normal-weight concrete, about 4,050 lb per cubic yard.
Rounding
Cubic yards and feet to two decimals, truck loads rounded up, weight to two decimals, area to one.
Edge cases
A blank thickness, or a custom court with blank dimensions, returns a prompt; a non-positive volume is blocked; a blank waste is zero.
Sources
See the Sources list below.
Last reviewed
2026-10-18.

Frequently Asked Questions About Basketball Court Concrete

How much concrete do I need for a basketball court?

A full 94 by 50 foot court at 4 inches needs about 63.8 cubic yards with waste, roughly 7 ready-mix truck loads. A half court is about half that. Pick your court size above for the exact figure.

What are the dimensions of a basketball court?

An NBA or college court is 94 by 50 feet, a high school court 84 by 50, a junior high court about 74 by 42, and an NBA half court 47 by 50. The tool uses these, or your own size for a home court.

How thick should a basketball court slab be?

Commonly 4 inches for an outdoor sport slab on a compacted base, with reinforcement and control joints. Heavier use may need more. The required thickness and reinforcement come from your plans; this tool estimates volume.

How much concrete for a half court?

An NBA half court, 47 by 50 feet at 4 inches, needs about 32 cubic yards with waste, roughly 4 truck loads. A smaller backyard half court takes less; enter a custom size to compare.

Can I pour a basketball court with bags?

No, it is far too much. A full court is over 60 cubic yards, which would be thousands of bags. A court is strictly a ready-mix pour; the bag figure is only there for scale.

How many concrete trucks for a basketball court?

About 7 for a full court at 4 inches, at roughly 10 cubic yards a truck, and about 4 for a half court. The tool shows the truck loads so you can schedule a continuous pour.

How much does a basketball court slab weigh?

A full 94 by 50 foot, 4 inch slab is roughly 129 short tons of concrete. The sub-base has to be compacted and well drained to carry it and keep the surface flat.

Is my data saved?

No. The calculation runs entirely in your browser and nothing you enter is stored or sent anywhere.

Sources

Related Calculators

Pouring a basketball court?

Explore all concrete calculators

This calculator is for general planning and estimating only and is not engineering advice. A sport slab needs the right thickness, reinforcement, sub-base, drainage and control joints for its use; those come from your plans or an engineer, not from this tool, which estimates the concrete volume to order. Spotted an error? Let us know.