Quick answer

A concrete calculator works out how much concrete a pour needs. It multiplies length by width by thickness for a slab, converts to cubic yards by dividing cubic feet by 27, then adds a waste allowance. A 10 by 10 foot slab at 4 inches thick is about 1.23 cubic yards, or roughly 56 eighty-pound bags, before waste.

Try
Concrete and Cement
Slab or footing uses length by width by thickness. Round column or pier uses diameter by height.
ft
Slab or footing length in feet. Slab shape only.
ft
Slab or footing width in feet. Slab shape only.
in
Slab thickness in inches. 4 in suits a patio, 6 in a driveway. Slab shape only.
in
Round column or pier diameter in inches. Column shape only.
ft
Column or pier height in feet. Column shape only.
Number of identical slabs, footings or columns.
%
Extra for spillage, over-excavation and uneven subgrade. 5 to 10 percent is typical.
Pre-mixed bag size, used only to estimate bag count if you bag the pour instead of ordering ready-mix.
$
Delivered price per cubic yard, to estimate cost. Leave blank to skip the cost line.
$
Cost of one pre-mixed bag of the selected size. Enter it with the ready-mix price to compare the two ways of buying. Leave blank to skip.

Concrete needed

—
Cubic feet—
Cubic meters—
Weight (short tons)—
Bags needed—
Ready-mix cost—
Bagged cost—

Calculations run in your browser. Inputs are not sent to our servers; anything you Save stays in this browser only.

Saved results (0)

How to Use the Concrete Calculator

  1. Choose the shape: a slab or footing (length by width by thickness) or a round column or pier (diameter by height).
  2. Enter the dimensions. Keep length, width and height in feet, and thickness or diameter in inches, exactly as the fields are labelled.
  3. Set the quantity of identical pours, add a waste allowance of 5 to 10 percent, and optionally a ready-mix price to estimate cost.
  4. Read the result: cubic yards is what a supplier delivers against, while bags and cost help you compare ordering options.

Here is what each result line means:

ResultWhat it means
Concrete neededTotal volume in cubic yards, including your waste allowance. This is the ordering number.
Cubic feetThe same volume in cubic feet, useful for bag counts and small pours.
Cubic metersThe metric volume, for suppliers or plans that use SI units.
Bags neededHow many pre-mixed bags of the selected size cover the volume, rounded up.
Estimated ready-mix costCubic yards multiplied by the delivered price you entered.

What Is a Concrete Calculator?

A concrete calculator is a tool that converts the dimensions of a pour into the amount of concrete you need to buy. It answers the single most common question on any slab, footing or post project: how much concrete do I order?

It helps homeowners, DIY builders, landscapers and contractors turn a sketch into an order. Concrete is sold by the cubic yard for ready-mix delivery, or by the bag for small pours, so the calculator translates feet and inches into both units at once. It is an estimating aid, not a structural design tool: it tells you the volume to order, not the mix strength, reinforcement or footing size your project requires.

How the Concrete Calculator Works

Concrete volume (cubic yards)
V = LWT27(1 + w)

Volume is length times width times depth. Because concrete is priced in cubic yards and one cubic yard equals 27 cubic feet, the calculator finds the volume in cubic feet and divides by 27.

  1. Convert thickness from inches to feet by dividing by 12 (a 4 inch slab is 0.333 feet).
  2. Multiply length by width by that thickness to get cubic feet, then multiply by the quantity of identical pours.
  3. Divide by 27 for cubic yards, and multiply by 0.0283168 for cubic meters.
  4. Add the waste allowance, then divide cubic feet by the bag yield (0.60 cubic feet for an 80 pound bag) for a bag count.

For a round column the footprint is a circle, so the volume is pi times the radius squared times the height, with the radius taken as half the diameter.

Round column volume
V = r2h

Concrete Calculator Example

Suppose you are pouring a patio slab 10 feet long, 10 feet wide and 4 inches thick, with a 10 percent waste allowance.

Worked example: 10 ft x 10 ft x 4 in slab
V = 10100.33327 = 33.3327 = 1.23

Calculation: thickness is 4 / 12 = 0.333 ft. Volume = 10 x 10 x 0.333 = 33.33 cu ft. In cubic yards that is 33.33 / 27 = 1.23 cu yd. Adding 10 percent waste gives 1.36 cu yd, or about 36.7 cu ft. At an 80 pound bag yield of 0.60 cubic feet, that is 36.7 / 0.60 = 62 bags.

The lesson: a pour this size sits on the line between bagging and a small ready-mix order. Sixty-plus bags is a lot of mixing, so most people would price a short-load delivery against the bag cost before deciding.

Factors That Change How Much Concrete You Need

Thickness

Thickness drives volume more than people expect because it multiplies the whole area. Moving a slab from 4 to 6 inches adds 50 percent to the concrete, so confirm the thickness your project actually calls for.

Subgrade and Over-excavation

A soft or uneven subgrade swallows concrete where the base dips below grade. This is the main reason real pours use more than the raw geometry suggests, and why a waste allowance exists.

Waste and Spillage

Some concrete is lost to the forms, the wheelbarrow, the chute and trimming. A 5 to 10 percent allowance covers it; add more for a complex pour or a long barrow run.

Shape and Edges

Thickened edges, footings under a slab, and round or stepped shapes all change the volume. Break an irregular pour into simple rectangles and columns, calculate each, and add them.

Bags vs Ready-Mix: Comparing the Cost

The volume decides which way of buying concrete makes sense. Bags suit small pours; ready-mix by the cubic yard suits large ones. The crossover is usually somewhere between one and two cubic yards.

OptionBest forTrade-off
Pre-mixed bagsSmall pours up to roughly 1 cubic yardSimple and on demand, but heavy, slow to mix and dearer per yard
Short-load ready-mixRoughly 1 to 3 cubic yardsMixed for you, with a short-load fee on small orders
Full ready-mix delivery3 cubic yards and upCheapest per yard, but you must place it fast and may pay for a full truck

An 80 pound bag yields about 0.60 cubic feet, so a single cubic yard (27 cubic feet) takes about 45 bags. Once a project needs dozens of bags, the ready-mix cost line in this calculator usually wins.

When to Use a Concrete Calculator

Ordering Ready-mix

Before you phone the supplier, size the order in cubic yards and add waste, so you neither run short mid-pour nor pay for concrete you cannot place.

Costing a Project

Enter a delivered price per yard to turn volume into a budget figure, then compare it against the equivalent cost in bags.

Planning Footings and Piers

Use the round-column shape for deck footings, fence posts and piers, multiply by the number of holes, and you have the total in one step.

Common Mistakes When Estimating Concrete

1. Mixing Up Feet and Inches

Entering thickness in feet instead of inches shrinks the result twelvefold. Keep length and width in feet and thickness in inches, as the fields are labelled.

2. Forgetting a Waste Allowance

Ordering the exact geometric volume leaves no margin for an uneven base or spillage. Running short mid-pour means a cold joint or a second delivery.

3. Ignoring Thickened Edges and Footings

A slab with a footing or a thickened edge holds more concrete than a flat rectangle. Add those parts separately.

4. Rounding Down Bags

Always round the bag count up. A part bag still has to be bought, and being one bag short stops the pour.

5. Treating the Estimate as a Structural Spec

Volume is not strength. Thickness, mix and reinforcement for a load-bearing slab or footing come from a code or an engineer, not from this tool.

Accuracy and Limitations

The arithmetic is exact; the usefulness of the answer depends on the dimensions and the waste allowance you give it.

What it calculates accurately

  • Volume in cubic yards, cubic feet and cubic meters for the shape and dimensions entered
  • Bag counts from a stated bag yield, rounded up
  • Ready-mix cost from the price per yard you enter

What it does not account for

  • Over-excavation beyond your waste allowance, or a subgrade that is out of level
  • Reinforcement, mix strength, slump or air content
  • Short-load fees, delivery charges and local taxes
  • Irregular shapes, unless you split them into rectangles and columns

How We Calculate Your Concrete Volume

Method
Length x width x thickness for a slab, or pi x radius squared x height for a round column, times the quantity, then a waste multiplier.
Inputs used
Shape, dimensions, quantity, waste percentage, bag size, and an optional ready-mix price.
Conversions
1 cubic yard = 27 cubic feet; 1 cubic foot = 0.0283168 cubic meters; 1 foot = 12 inches.
Bag yields
80 lb bag = 0.60 cu ft, 60 lb = 0.45 cu ft, 40 lb = 0.30 cu ft (typical pre-mixed concrete).
Weight
Estimated at 150 lb per cubic foot, about 4,050 lb (roughly 2 short tons) per cubic yard for normal-weight concrete.
Cost comparison
Ready-mix cost = cubic yards x your price per yard; bagged cost = bag count x your price per bag. The verdict names the cheaper option when both prices are entered.
Rounding
Cubic yards and feet to two decimals, cubic meters to three, bag counts rounded up to a whole bag.
Edge cases
Zero or blank dimensions return a prompt, not a number; a non-positive volume is blocked.
Sources
See the Sources list below.
Last reviewed
2026-10-17.

Frequently Asked Questions About the Concrete Calculator

How much concrete do I need for a 10 by 10 slab?

A 10 by 10 foot slab at 4 inches thick needs about 1.23 cubic yards, or roughly 1.36 cubic yards once you add a 10 percent waste allowance. That is around 56 to 62 eighty-pound bags, which is why most people order ready-mix at this size.

How many 80 lb bags of concrete are in a cubic yard?

About 45. An 80 pound bag of pre-mixed concrete yields roughly 0.60 cubic feet, and a cubic yard is 27 cubic feet, so 27 divided by 0.60 is 45 bags. A 60 pound bag yields about 0.45 cubic feet, which is about 60 bags per yard.

How do I convert cubic feet to cubic yards?

Divide the cubic feet by 27, because one cubic yard contains 27 cubic feet. For example, 54 cubic feet is 2 cubic yards. The calculator does this step for you and also shows cubic meters.

How much waste should I add?

Between 5 and 10 percent for most pours. The allowance covers spillage, an uneven subgrade and concrete left in the barrow or chute. Add more for a complex shape, a long barrow run or a rough base.

Does the calculator work for round columns and footings?

Yes. Switch the shape to round column or pier and enter the diameter in inches and the height in feet. For several identical footings, set the quantity and the tool totals them in one step.

What thickness should a concrete slab be?

It depends on the load. A footpath or patio is often 4 inches, while a driveway that carries vehicles is usually 6 inches or more. Use the figure from your plans or local code; this tool estimates volume, not the required thickness.

Why is my supplier quote different from the calculator?

Suppliers add short-load fees, delivery charges and tax, and they may round up to a whole or half yard. The calculator estimates the concrete volume and material cost, not the full invoice. Always confirm the final quantity with the supplier.

Should I order a little extra concrete?

Yes. Running short mid-pour risks a cold joint or a second delivery, both of which cost far more than a small surplus. The waste allowance is there to give you that margin without guessing.

How much does a yard of concrete weigh?

About 4,050 pounds, or roughly 2 short tons, for normal-weight concrete at 150 pounds per cubic foot. Lightweight mixes weigh less. The calculator shows the estimated weight so you can plan barrow loads, access and subgrade support.

Is it cheaper to use bags or ready-mix?

For small pours under about a cubic yard, bags are convenient and often cheaper once you count delivery and short-load fees. Past one to two cubic yards, ready-mix usually wins. Enter both a price per yard and a price per bag and the verdict names the cheaper option.

Is my data saved?

No. The calculation runs entirely in your browser and nothing you enter is stored or sent anywhere.

Sources

Related Calculators

Planning a concrete project?

Explore all concrete calculators

This calculator is for general planning and estimating only and is not engineering advice. Results are estimates based on the figures you enter. For structural work, order quantities, mix design or site conditions, confirm with your ready-mix supplier or a qualified professional before you pour. Spotted an error? Let us know.