Quick answer

A flowable fill calculator works out how much controlled low-strength material a trench or void needs. It multiplies length by width by depth to get the volume, adds a small waste allowance, then divides cubic feet by 27 for cubic yards. A 50 by 2 by 3 foot trench is about 11.1 cubic yards, or 12.2 cubic yards once you add 10 percent waste.

Try
Concrete and Cement
A rectangular trench or excavation uses length by width by depth. A round pipe or void uses diameter by length.
ft
Length of the trench or excavation in feet. Trench shape only.
ft
Width in feet. Trench shape only.
ft
Depth of flowable fill in feet. Enter the fill depth, not the full excavation, if only part is filled. Trench shape only.
in
Inside diameter of the pipe or void in inches. Round shape only.
ft
Length of the pipe or void in feet. Round shape only.
Number of identical trenches, pipes or voids.
%
Extra for over-excavation, irregular voids and slight subsidence. 5 to 10 percent is typical; more for a rough or collapsing excavation.
pcf
Plastic unit weight of the mix in pounds per cubic foot, used only for the weight estimate. Around 120 is a common placeholder for standard CLSM; low-density foamed CLSM is much lighter. Confirm the value for your mix (ASTM D6023).
$
Delivered price per cubic yard, to estimate material cost. Enter your supplier quote. Leave blank to skip the cost line.

Flowable fill to order

—
Cubic feet—
Cubic meters—
Weight (short tons)—
Truck loads (10 cu yd)—
Material cost—

Calculations run in your browser. Inputs are not sent to our servers; anything you Save stays in this browser only.

Saved results (0)

How to Use the Flowable Fill Calculator

  1. Choose the shape: a rectangular trench or excavation (length by width by depth) or a round pipe or void (diameter by length).
  2. Enter the dimensions. Keep trench length, width and depth in feet, and pipe diameter in inches, exactly as the fields are labelled.
  3. Set the quantity of identical fills and a waste allowance of 5 to 10 percent for over-excavation and irregular voids.
  4. Read the result: cubic yards is the ordering number. Add a unit weight for the tonnage, or a price per yard for the material cost.

Here is what each result line means:

ResultWhat it means
Flowable fill to orderTotal volume in cubic yards, including the waste allowance. This is the ordering number.
Cubic feetThe same volume in cubic feet, useful for small voids and pipe abandonment.
Cubic metersThe metric volume, for suppliers or plans in SI units.
Weight (short tons)Estimated mass at the unit weight you enter. CLSM is heavier than loose soil.
Truck loadsReady-mix truck loads at roughly 10 cubic yards each, rounded up.

What Is Flowable Fill?

Flowable fill is a self-levelling, low-strength concrete used as backfill instead of compacted soil. ACI 229R calls it a self-consolidating cementitious material used primarily as a backfill as an alternative to compacted fill, and it is also known as controlled low-strength material (CLSM), controlled density fill, lean concrete slurry and unshrinkable fill.

Because it flows into place and hardens in hours without layered compaction, it fills trenches, abandoned pipes and awkward voids that a plate compactor could never reach. By definition it is weak: ACI sets the ceiling at a 28-day compressive strength of 1200 psi (8.3 MPa) or less, and most applications stay at 300 psi (2.1 MPa) or less so the fill can be dug out again later. This tool estimates the volume to order for that fill. It is not a mix-design or strength tool; if you need the proportions of a conventional structural mix instead, use the concrete mix calculator, size the binder with the cement calculator, or check mix water against a target with the water cement ratio calculator.

How the Flowable Fill Calculator Works

Flowable fill volume (cubic yards)
V = LWD27(1 + w)

The volume of a trench is length times width times depth. Because flowable fill is sold by the cubic yard and one cubic yard equals 27 cubic feet, the tool finds the volume in cubic feet and divides by 27, then adds the waste allowance.

  1. Multiply trench length by width by depth, all in feet, to get the volume in cubic feet.
  2. Multiply by the quantity of identical trenches, pipes or voids.
  3. Add the waste allowance for over-excavation, then divide by 27 for cubic yards and multiply by 0.0283168 for cubic meters.
  4. Multiply cubic feet by the unit weight for the tonnage, and divide cubic yards by about 10 for ready-mix truck loads.

For a round pipe or void the cross-section is a circle, so the volume is pi times the radius squared times the length, with the radius taken as half the diameter.

Round pipe or void volume
V = r2L

Flowable Fill Example

Suppose you are filling a utility trench 50 feet long, 2 feet wide and 3 feet deep, with a 10 percent waste allowance.

Worked example: 50 ft x 2 ft x 3 ft trench, 10% waste
V = 5023271.10 = 12.22

Calculation: volume = 50 x 2 x 3 = 300 cu ft. In cubic yards that is 300 / 27 = 11.11 cu yd. Adding 10 percent waste gives 300 x 1.10 = 330 cu ft, or 12.22 cu yd. At a unit weight of 120 pounds per cubic foot that is about 19.8 short tons, and at roughly 10 cubic yards a truck it is 2 truck loads.

The lesson: order the 12.22 cubic yards, not the bare 11.11, and line up continuous delivery so the two loads place without a cold joint.

Factors That Change How Much Flowable Fill You Need

Over-excavation

A trench is rarely cut to the exact plan size. Any over-dig below or beside the line fills with flowable fill, which is the main reason real volume beats the geometry and why a waste allowance exists.

Irregular and Collapsing Voids

Abandoned tanks, washouts and rock pockets hold more than their nominal shape. Because flowable fill self-levels, it finds every cavity, so round up and add waste for a rough excavation.

Pipe and Object Displacement

A pipe, duct or structure left in the trench displaces fill. Subtract its volume, or enter only the net space to be filled, so you do not over-order around large objects.

Fill Depth Versus Trench Depth

Sometimes only the lower part of a trench is flowable fill and the rest is soil or pavement. Enter the fill depth, not the full excavation depth, or the estimate runs high.

Mix and Unit Weight

Standard CLSM is considerably heavier than loose soil, while low-density foamed CLSM is much lighter. Volume is unchanged, but the tonnage and the load on the subgrade depend on which mix you use.

Flowable Fill vs Compacted Backfill

Flowable fill and compacted granular backfill both fill a trench, but they behave very differently. Flowable fill costs more per cubic yard yet often wins on in-place cost because it needs no compaction, testing or lift-by-lift labour.

MeasureFlowable fill (CLSM)Compacted backfill
PlacementSelf-levels, fills every void, hardens in hoursPlaced and compacted in lifts
Labour and testingMinimal; no compaction or density testsCompaction equipment and density testing each lift
AccessReaches narrow trenches and under pipesHard to compact in tight or deep spaces
Material costHigher per cubic yardLower per cubic yard

Because it is ordered and placed like ready-mix, in conventional concrete trucks, you can size and schedule a job the same way you would a small pour.

When to Use Flowable Fill

Utility Trenches

The classic use is backfilling pipe and cable trenches in roadways, where compaction is slow and settlement later cracks the pavement. Flowable fill places fast and will not settle.

Abandoning Pipes and Tanks

Fill a decommissioned sewer, culvert or underground tank so it cannot collapse or float. Use the round shape for a pipe and enter the inside diameter.

Voids Under Slabs and Structures

Fill washouts, over-excavations and voids beneath slabs, footings and bridge approaches where hand compaction is impractical.

Common Mistakes When Estimating Flowable Fill

1. Using Trench Depth Instead of Fill Depth

If only the lower part of the trench is flowable fill, entering the full excavation depth over-orders. Enter just the depth you are filling.

2. Ignoring Over-excavation

Ordering the exact plan volume leaves nothing for over-dig and irregular walls. Flowable fill reaches every void, so under-ordering stops the placement short.

3. Forgetting to Subtract Large Objects

A big pipe or tank in the trench displaces fill. Not subtracting it buys concrete you cannot place.

4. Treating It as Structural Concrete

Flowable fill is deliberately weak. Do not use its volume estimate to size a load-bearing element, and do not substitute it for structural concrete.

5. Not Planning Continuous Delivery

On a larger fill, trucks arriving with gaps let an earlier lift stiffen. Order the full quantity and schedule the loads back to back.

Accuracy and Limitations

The volume arithmetic is exact; the usefulness of the answer depends on the dimensions, the waste allowance and the unit weight you give it.

What it calculates accurately

  • Volume in cubic yards, cubic feet and cubic meters for the shape and dimensions entered
  • Truck loads at about 10 cubic yards each, rounded up
  • Weight from the unit weight you enter, and material cost from the price per yard

What it does not account for

  • Over-excavation beyond your waste allowance, or voids you have not measured
  • Mix design, strength, flowability or excavatability, which follow ACI 229R or your spec
  • Displacement by pipes, tanks or structures unless you net it out
  • Delivery, short-load fees and taxes

How We Calculate Your Flowable Fill Volume

Method
Length x width x depth for a trench, or pi x radius squared x length for a round pipe or void, times the quantity, then a waste multiplier.
Inputs used
Shape, dimensions, quantity, waste percentage, unit weight, and an optional price per cubic yard.
Conversions
1 cubic yard = 27 cubic feet; 1 cubic foot = 0.0283168 cubic meters; 1 foot = 12 inches.
Weight
Cubic feet times the unit weight you enter, divided by 2,000 for short tons. CLSM unit weight varies by mix; confirm it per ASTM D6023.
Truck loads
Cubic yards divided by 10 and rounded up; flowable fill is delivered in conventional ready-mix trucks.
Rounding
Cubic yards and feet to two decimals, cubic meters to three, weight to two, truck loads up to a whole load.
Edge cases
Zero or blank dimensions return a prompt, not a number; a non-positive volume is blocked; a blank waste is treated as zero.
Sources
See the Sources list below.
Last reviewed
2026-10-18.

Frequently Asked Questions About the Flowable Fill Calculator

What is flowable fill?

Flowable fill is a self-levelling, low-strength cementitious backfill used instead of compacted soil, known technically as controlled low-strength material (CLSM). ACI 229R defines it as a self-consolidating material used as an alternative to compacted fill, with a 28-day compressive strength of 1200 psi or less.

How much flowable fill do I need for a trench?

Multiply the trench length by width by depth in feet, divide by 27 for cubic yards, then add 5 to 10 percent for over-excavation. A 50 by 2 by 3 foot trench is about 11.1 cubic yards, or 12.2 cubic yards with 10 percent waste. Enter your dimensions above for the exact figure.

Is flowable fill the same as concrete?

No. Both are cementitious, but flowable fill is deliberately weak and self-levelling, made to be dug out again, while structural concrete is strong and must be placed and finished. Flowable fill is ordered by the cubic yard like ready-mix and delivered in the same trucks.

How do I estimate flowable fill to abandon a pipe?

Use the round shape and enter the inside diameter in inches and the length in feet. The tool finds the internal volume as pi times the radius squared times the length. For a 24 inch pipe 60 feet long that is about 7 cubic yards before waste.

How strong is flowable fill?

Low by design. ACI 229R caps it at 1200 psi at 28 days, and most applications stay at 300 psi or less so the fill stays removable; mixes meant to be dug by hand are usually targeted under 100 psi long-term. It is backfill, not a structural material.

How much does a cubic yard of flowable fill weigh?

It depends on the mix. At a unit weight of 120 pounds per cubic foot a cubic yard weighs about 3,240 pounds, roughly 1.6 short tons. Low-density foamed CLSM weighs far less. Enter the unit weight of your mix for an accurate tonnage.

How much waste should I add?

Between 5 and 10 percent for most trenches. The allowance covers over-excavation, irregular walls and slight subsidence as the fill settles into voids. Add more for a rough, collapsing or very irregular excavation.

Does flowable fill need compaction?

No. It self-levels and consolidates under its own weight, filling voids that a compactor cannot reach, and hardens in a few hours. Eliminating compaction and density testing is the main reason it often beats compacted backfill on in-place cost.

Is my data saved?

No. The calculation runs entirely in your browser and nothing you enter is stored or sent anywhere.

Sources

Related Calculators

Backfilling a trench or void?

Explore all concrete calculators

This calculator is for general planning and estimating only and is not engineering advice. Flowable fill mix design, strength, excavatability and placement must follow ACI 229R, your specification or an engineer. Confirm quantities, unit weight and mix with your ready-mix supplier before you order, especially for structural or load-bearing backfill. Spotted an error? Let us know.