Bagged vs Ready Mix Calculator

Quick answer

A bagged vs ready-mix calculator compares the cost of bagging a pour against ordering ready-mix. It sizes the volume, counts the bags you would buy, then weighs that against cubic yards of delivered concrete plus delivery and short-load fees. Bags usually win below about a cubic yard; ready-mix wins above one to two cubic yards.

Try
Concrete and Cement
Slab or footing uses length by width by thickness. Round column or pier uses diameter by height.
ft
Slab or footing length in feet. Slab shape only.
ft
Slab or footing width in feet. Slab shape only.
in
Slab thickness in inches. Slab shape only.
in
Round column or pier diameter in inches. Column shape only.
ft
Column or pier height in feet. Column shape only.
Number of identical slabs, footings or columns.
%
Extra for spillage and an uneven base. 5 to 10 percent is typical; it applies to both options.
Pre-mixed bag size. QUIKRETE Concrete Mix yields about 0.60 cu ft per 80 lb bag, 0.45 per 60 lb, 0.30 per 40 lb.
$
Cost of one bag of the selected size.
$
Delivered price per cubic yard from your supplier.
$
Flat delivery or trip charge for the ready-mix truck, if any. Leave blank for none.
$
Surcharge ready-mix suppliers add on small orders below a full truck. Enter it to compare fairly on a small pour. Leave blank for none.

Cheaper option

—
Concrete volume—
Bags needed—
Bagged total—
Ready-mix total—

Calculations run in your browser. Inputs are not sent to our servers; anything you Save stays in this browser only.

Saved results (0)

How to Use the Bagged vs Ready Mix Calculator

  1. Enter the dimensions of your pour and a 5 to 10 percent waste allowance, the same way you would size any concrete job.
  2. Pick the bag size and enter the price per bag you would pay.
  3. Enter the ready-mix price per cubic yard, plus any delivery and short-load fees your supplier charges on a small order.
  4. Read the result: which option is cheaper, the two totals side by side, and the bags you would need.

Here is what each result line means:

ResultWhat it means
Cheaper optionWhich of the two costs less for the pour and prices you entered.
Concrete volumeThe volume to buy either way, in cubic yards, including waste.
Bags neededWhole bags of the chosen size, rounded up.
Bagged total and Ready-mix totalThe full cost of each option, so you can see the gap.

What Is a Bagged vs Ready Mix Calculator?

A bagged vs ready-mix calculator is a decision tool that prices the same concrete pour two ways and tells you which is cheaper. It answers the question on every mid-sized job: do I buy bags and mix them, or order a ready-mix delivery?

The two are sold differently. Bagged concrete is priced per bag, each covering a fixed volume, so the cost rises step by step with the bag count. Ready-mix is priced per cubic yard delivered, often with a delivery charge and a short-load fee on small orders. This tool sizes the volume once, then applies both pricing models so you compare like for like. To price a ready-mix pour on its own, use the concrete cost calculator.

How the Bagged vs Ready Mix Calculator Works

Bagged total
bagged = Vyp

The tool first finds the volume of your pour in cubic feet and cubic yards, with the waste allowance added, because that volume is what you buy either way. It then costs each option separately.

  1. Divide the volume in cubic feet by the bag yield and round up to whole bags, then multiply by the price per bag.
  2. Multiply the cubic yards by the ready-mix price per yard, then add the delivery and short-load fees.
  3. Compare the two totals and report the cheaper one and the difference.

The short-load fee matters most on small pours, where it can swing the decision toward bags, so enter it to compare fairly.

Ready-mix total
ready = Yr + delivery + short-load

Bagged vs Ready Mix Example

Suppose you are pouring a driveway section 20 feet long, 10 feet wide and 4 inches thick, with 10 percent waste, 80 pound bags at $7, ready-mix at $160 a yard and a $60 short-load fee.

Calculation: volume = 20 x 10 x (4 / 12) = 66.7 cu ft, plus 10 percent is 73.3 cu ft, or 2.72 cu yd. Bagged: 73.3 / 0.60 = 123 bags at $7 = $861. Ready-mix: 2.72 x $160 + $60 = $495. Ready-mix is cheaper by about $366.

The lesson: once a pour reaches a couple of cubic yards, the bag count and its cost climb past a ready-mix delivery, even with the short-load fee. On a small pad the fee can flip the answer the other way.

Factors That Change Which Is Cheaper

Volume

Volume is the biggest lever. Bagged cost rises in a straight line with the bag count, while ready-mix spreads its fixed fees over more yards, so the more concrete you need, the better ready-mix looks.

Short-load and Delivery Fees

On a small pour the short-load fee can be most of the ready-mix bill, which is why bags often win under a cubic yard. Always enter the fee, or the comparison flatters ready-mix.

Bag Size and Price

Bigger bags cost less per cubic foot but weigh more. The price per bag you can actually get, including sales and bulk pallets, moves the bagged total up or down.

Hidden Costs

This tool compares material and delivery only. Mixing bags by hand costs time and a mixer rental; ready-mix must be placed fast. Those real costs are not in the price per bag or per yard.

Bagged vs Ready Mix: the Trade-offs

Price is only half the decision. The two options differ in effort, speed and flexibility, and the right choice depends on the pour as much as the total cost.

MeasureBagged concreteReady-mix delivery
Best volumeUp to about 1 cubic yardAbout 1 cubic yard and up
EffortHaul, mix and place each bagDelivered mixed, placed fast
FeesNone, but dearer per cubic footDelivery and short-load fees on small loads
FlexibilityPour at your own pace, any dayMust be ready when the truck arrives

If you lean toward bagging, the concrete mix calculator helps you batch your own from cement, sand and gravel, and the cement calculator sizes the binder.

When to Use This Comparison

Mid-sized Pours

The comparison matters most between about half a cubic yard and three cubic yards, where neither option is the obvious winner and the fees decide it.

Budgeting a Project

Before you buy, price both ways so the budget reflects the cheaper route and the fees you will actually pay.

Remote or Access-limited Sites

Where a truck cannot reach or a delivery minimum is high, bags may win even on a larger pour. Enter a high short-load fee or delivery charge to see the effect.

Common Mistakes When Comparing

1. Leaving Out the Short-load Fee

Comparing a bare price per yard against bags ignores the surcharge that makes small ready-mix orders expensive. Always include it.

2. Forgetting Waste on Both Sides

Both options need the same waste allowance. Sizing bags with waste but ready-mix without, or the reverse, skews the result.

3. Ignoring Your Own Time and a Mixer

Mixing dozens of bags by hand is hours of work and often a rental. The cheaper material total is not always the cheaper job.

4. Using an Unrealistic Bag Price

Shelf price, sale price and pallet price differ. Enter the price you can actually get for the quantity you need.

5. Treating the Totals as the Full Invoice

Neither total includes tax, pump hire, labour or finishing. Use the comparison to choose the route, then get a full quote.

Accuracy and Limitations

The arithmetic and the bag yields are exact; the result is only as good as the prices and fees you enter, which vary by supplier and region.

What it calculates accurately

  • Volume, bag count and both totals for the dimensions and prices entered
  • The cheaper option and the difference between the two
  • The effect of delivery and short-load fees on the comparison

What it does not account for

  • Tax, pump hire, equipment rental, labour and finishing
  • Your own time mixing bags, or a mixer rental
  • Supplier minimums, access limits and sale or pallet pricing you have not entered
  • Quality or workability differences between a hand-mixed and a plant-mixed batch

How We Compare the Two Options

Method
Size the volume once (with waste), then cost it two ways: bagged = bags rounded up x price per bag; ready-mix = cubic yards x price per yard + delivery + short-load fees. The lower total wins.
Inputs used
Shape, dimensions, quantity, waste, bag size and price, ready-mix price per yard, delivery fee and short-load fee.
Bag yields
80 lb bag ~ 0.60 cu ft, 60 lb ~ 0.45 cu ft, 40 lb ~ 0.30 cu ft, per the QUIKRETE Concrete Mix 1101 data sheet.
Conversions
1 cubic yard = 27 cubic feet; 1 foot = 12 inches.
Rounding
Bags rounded up to a whole bag; cubic yards to two decimals; totals to the cent.
Edge cases
Zero or blank dimensions return a prompt; a missing bag price or ready-mix price pauses the comparison until both are entered.
Sources
See the Sources list below.
Last reviewed
2026-10-18.

Frequently Asked Questions About Bagged vs Ready Mix Concrete

Is it cheaper to use bags or ready-mix concrete?

It depends on the volume and the fees. Below about one cubic yard, bags are usually cheaper once a ready-mix short-load fee is counted. Above one to two cubic yards, ready-mix almost always wins because its fixed fees spread over more concrete. Enter your prices above to see the crossover for your job.

How many 80 lb bags equal a yard of ready-mix?

About 45. An 80 pound bag yields roughly 0.60 cubic feet and a cubic yard is 27 cubic feet, so 27 divided by 0.60 is 45 bags. At typical prices, 45 bags usually cost more than a yard of delivered ready-mix once you place a full load.

What is a short-load fee?

A surcharge ready-mix suppliers add when you order less than a full truck, often around a few yards. It covers the trip for a partly filled truck and can be most of the bill on a small pour, which is why it often tips small jobs toward bags.

At what size should I switch from bags to ready-mix?

Usually between one and two cubic yards, but the fees move the line. A high short-load fee pushes the switch to a larger volume; a low one brings it earlier. The tool shows the totals at your size so you can see where your crossover falls.

Does the comparison include my labour?

No. It compares the material plus delivery and short-load fees only. Mixing many bags by hand is hours of work and often a mixer rental, so the true cost of bagging is higher than the bag total alone.

Why is ready-mix cheaper per cubic yard?

Because it is batched in bulk at a plant and delivered in volume, while bags carry packaging, handling and retail markup. The saving only shows once your pour is big enough to cover the delivery and short-load fees.

Should I add waste to both options?

Yes. Both the bag count and the ready-mix volume should include the same waste allowance, usually 5 to 10 percent, so the comparison is fair. The tool applies your waste to both sides.

Can I compare different bag sizes?

Yes. Switch the bag size and the tool recomputes the bag count and bagged total. Larger bags cost less per cubic foot but weigh more, so the cheapest bag option is not always the easiest to handle.

Does the total include tax and delivery?

It includes the delivery and short-load fees you enter, but not sales tax, pump hire or labour. Treat the result as a material-and-delivery comparison to choose a route, then get a full quote.

Is my data saved?

No. The calculation runs entirely in your browser and nothing you enter is stored or sent anywhere.

Sources

Related Calculators

Deciding how to buy your concrete?

Explore all concrete calculators

This calculator is for general planning and estimating only and is not engineering advice. Prices, delivery charges and short-load fees vary by supplier and region; enter your own quotes. Results are estimates based on the figures you enter, and do not include tax, equipment rental or labour. Confirm the final price with your supplier before you buy. Spotted an error? Let us know.