A concrete beam calculator works out how much concrete a rectangular beam needs. It multiplies length by width by depth in feet, times the number of beams, divides by 27 for cubic yards, then adds waste. A 20 foot beam 12 inches wide and 18 inches deep is about 1.22 cubic yards with 10 percent waste.
Concrete needed
Calculations run in your browser. Inputs are not sent to our servers; anything you Save stays in this browser only.
Saved results (0)
How to Use the Concrete Beam Calculator
- Enter the beam length in feet, along the span.
- Enter the width and depth in inches, from your plans.
- Set the number of beams for identical beams, and a 5 to 10 percent waste allowance.
- Pick a bag size for a bag count, then read the cubic yards to order.
Here is what each result line means:
| Result | What it means |
|---|---|
| Concrete needed | Total volume in cubic yards, including waste. This is the ordering number. |
| Cubic feet | The same volume in cubic feet, for bag counts and small pours. |
| Cubic meters | The metric volume, for suppliers or plans in SI units. |
| Bags needed | How many bags of the selected size the beams take, rounded up. |
| Weight | Approximate placed weight in short tons. |
| Volume per beam | Cubic yards in a single beam, for planning each pour. |
What Is a Concrete Beam Calculator?
A concrete beam calculator turns the length, width and depth of a beam into the amount of concrete to order. It is for rectangular beams: grade beams in a foundation, tie beams, lintels and headers over openings, and similar cast-in-place members.
A beam is a long rectangular prism, so its volume is length times width times depth. The tool converts feet and inches into cubic yards and bags and adds a waste allowance for form deflection and over-pour at the ends. To get the mix proportions right use the concrete mix calculator, and for the binder use the cement calculator.
How the Concrete Beam Calculator Works
Because a beam is a rectangular prism, its volume is simply length times width times depth, with every dimension in the same units. The tool works in feet and divides by 27 for cubic yards.
- Convert the width and depth from inches to feet by dividing by 12.
- Multiply length by width by depth for the volume of one beam in cubic feet.
- Multiply by the number of beams, then add the waste allowance.
- Divide by 27 for cubic yards, multiply by 0.0283168 for cubic meters, and divide cubic feet by the bag yield for a bag count.
Beams are almost always reinforced; size the bar grid with the concrete weight calculator for the placed weight.
Concrete Beam Example
Suppose you are pouring a grade beam 20 feet long, 12 inches wide and 18 inches deep, with 10 percent waste.
Calculation: the width is 12 / 12 = 1 ft and the depth is 18 / 12 = 1.5 ft. Volume = 20 x 1 x 1.5 = 30 cu ft, or 30 / 27 = 1.11 cu yd. Adding 10 percent waste gives 33 cu ft, about 1.22 cu yd and roughly 55 eighty-pound bags.
The lesson: a deep beam holds a surprising amount of concrete, because depth and width multiply along the whole span.
Factors That Change How Much a Beam Needs
Depth
Depth usually governs a beam and it multiplies the whole length, so it moves the volume most. Confirm the depth before ordering.
Width
Width multiplies the volume directly too. A wider beam carries more concrete over the same span.
Length and Span
Length scales the volume one for one, so a long beam uses proportionally more. Measure the full poured length, including any bearing into supports.
Number of Beams
Repeating identical beams multiplies any per-beam error, so confirm one beam first, then set the count.
Grade Beams vs Lintels and Headers
Rectangular concrete beams do different jobs, which changes how you measure and pour them.
| Measure | Grade beam | Lintel or header |
|---|---|---|
| Where it sits | At or below grade, spanning between piers or footings | Over a door or window opening |
| Typical size | Longer and deeper | Shorter, sized to the opening and bearing |
| How to enter it | Full length, one beam | Opening width plus bearing, quantity for repeats |
| Pour | Often with the foundation | A small, separate pour or part of a wall lift |
For the delivered price of either pour, the concrete cost calculator in the related tools prices it by the yard.
When to Use a Concrete Beam Calculator
Ordering Concrete for a Beam
Size the beam in cubic yards and add waste before you order, so you can pour each beam in one continuous run without a cold joint.
Pricing a Small Beam or Lintel
For a short lintel or header, the bag count shows how many bags to buy and whether hand mixing is realistic.
Planning Repeated Beams
Tie beams and joists are repeated members; the quantity field totals them so you order once for the whole set.
Common Mistakes When Estimating Beams
1. Mixing Up Inches and Feet
Enter length in feet and width and depth in inches, as the fields are labelled. Entering depth in feet shrinks the result twelvefold.
2. Swapping Width and Depth
Width and depth both multiply the volume, so swapping them gives the same total, but it matters for the forms and the bar layout. Keep depth as the vertical face.
3. Forgetting Bearing Length
A beam bears into its supports at each end, so the poured length is a little more than the clear span. Include the bearing.
4. Ignoring a Haunch or Drop
A thickened haunch or a drop panel holds extra concrete. Work those parts out separately and add them.
5. Treating the Estimate as a Design
Volume is not capacity. Beam size, span and reinforcement come from an engineer or code, not from this tool.
Accuracy and Limitations
The arithmetic is exact; the usefulness depends on the dimensions, quantity and waste you enter.
What it calculates accurately
- Rectangular beam volume in cubic yards, cubic feet and cubic meters
- Multiple identical beams through the quantity field
- Bag counts from a stated bag yield, rounded up, plus weight and per-beam volume
What it does not account for
- Haunches, drops, tapers or non-rectangular sections, unless added separately
- Form deflection and end over-pour beyond your waste allowance
- Reinforcement, span and structural capacity
- Delivery, short-load fees and taxes
How We Calculate Your Beam Concrete
Frequently Asked Questions About the Concrete Beam Calculator
How do I calculate concrete for a beam?
Multiply the length by the width by the depth, all in feet, then divide by 27 for cubic yards and add 5 to 10 percent waste. A 20 foot beam 12 inches wide and 18 inches deep is 20 x 1 x 1.5 = 30 cubic feet, about 1.11 cubic yards before waste.
How much concrete does a grade beam need?
It depends on the size. A 20 foot grade beam 12 inches wide and 18 inches deep is about 1.11 cubic yards, or 1.22 with a 10 percent allowance, roughly 55 eighty-pound bags. Enter your own length, width and depth above for the exact figure.
What is the difference between width and depth on a beam?
Width is the horizontal face and depth is the vertical face. Both multiply the volume the same way, but depth usually governs a beam structurally, and the two must match the forms and the bar layout even though they give the same volume if swapped.
How many bags of concrete for a beam?
A 20 foot beam 12 by 18 inches is roughly 55 eighty-pound bags with waste, which is a lot to mix by hand, so a beam this size is usually ready-mix. The tool gives the bag count for your beam and bag size, rounded up.
Can I use this for a lintel or header?
Yes. Enter the opening width plus the bearing at each end as the length, and the lintel width and depth. Set the quantity if you have several identical lintels, and the tool totals the concrete.
Should I add waste for a beam pour?
Yes, 5 to 10 percent. Formed beams lose concrete to form deflection, the ends and spillage, and a cold joint in a beam is a weak point, so a margin keeps the pour continuous.
Does the calculator size the beam for me?
No. It estimates the concrete volume once you enter the size. The required beam depth, span and reinforcement come from your plans, local code or a structural engineer.
Does it include the reinforcement?
No. It estimates the concrete only. Beams are reinforced with bar and stirrups that you size separately from your drawings or with a rebar estimate.
Is my data saved?
No. The calculation runs entirely in your browser and nothing you enter is stored or sent anywhere.
Sources
- QUIKRETE Concrete Mix 1101 data sheet (QUIKRETE; bag yields 0.60, 0.45 and 0.30 cu ft).
- National Ready Mixed Concrete Association (NRMCA; ready-mixed concrete and ordering).
- American Cement Association (American Cement Association; reinforced concrete basics).
Related Calculators
Pouring beams or lintels?
Explore all concrete calculatorsThis calculator is for general planning and estimating only and is not engineering advice. Beam size, span, reinforcement and load capacity come from your plans, local building code or a structural engineer, not from this tool, which estimates the concrete volume to order for a rectangular beam you describe. Spotted an error? Let us know.