The 3-2-10 Chimney Rule Explained

a plain brick chimney stack on a pitched roof against a pale sky, no people or text

The 3-2-10 chimney rule is shorthand for two IRC R1003.9 height minimums. Learn the 3-foot and 2-foot tests, the 10-foot zone, and what drives downdraft.

Stamped Concrete Pros and Cons

Featured image with the headline Stamped Concrete Pros and Cons, beside a warm earthy stamped concrete surface with an ashlar slate pattern of tooled rectangular seams in raking daylight

Stamped concrete pros and cons from ConcreteNetwork: the look and savings, the cracks and slip risk, resealing every 2 to 3 years, and stamped vs pavers.