Concrete Evaporation Rate Calculator

Quick answer

A concrete evaporation rate calculator estimates how fast water leaves a fresh concrete surface, using air temperature, relative humidity, concrete temperature and wind speed. Guidance cited on this page says plastic shrinkage cracks are expected above 0.2 lb/ft2/h (about 1.0 kg/m2/h). At 80 F air and concrete, 50 percent humidity and a 10 mph wind, the rate is 0.143.

Updated 2026-10-17By Shakeel Muzaffar | Reviewed by Prof. Dr. Khalil Mudassar, PhD
Try
Hot and Windy Weather
Switching units converts the values you have already entered.
Air temperature near the placement, in the shade of a thermometer, not in direct sun.
%
0 to 100 percent, measured at the site.
Temperature of the fresh concrete, taken with a thermometer in the mix.
Wind speed over the surface. Use 0 for still air.

Evaporation rate

—
Same rate, other unit—
Share of 0.2 lb/ft2/h level—
Water lost per hour—

Calculations run in your browser. Inputs are not sent to our servers; anything you Save stays in this browser only.

Saved results (0)

How to Use the Concrete Evaporation Rate Calculator

  1. Pick US or metric units, then enter the air temperature and relative humidity measured at the site.
  2. Enter the concrete temperature from a thermometer in the fresh mix, and the wind speed over the surface.
  3. Read the evaporation rate and the colored band, then compare it with the 0.1 and 0.2 lb/ft2/h levels before you place or finish.

Here is what each result means:

ResultWhat it means
Evaporation rateEstimated water loss from a free water surface, in lb/ft2/h or kg/m2/h, in the unit you chose.
Same rate, other unitThe identical rate in the other unit system, so you can read a US or metric specification.
Share of 0.2 lb/ft2/h levelThe rate as a percentage of the 0.2 lb/ft2/h level. 100 percent is the level where cracks are expected.
Water lost per hourThe water that rate removes from 100 ft2 (US) or 10 m2 (metric) in one hour.

What Is the Concrete Evaporation Rate?

The concrete evaporation rate is the estimated mass of water that leaves each unit of fresh concrete surface per hour, written in pounds per square foot per hour (lb/ft2/h) or kilograms per square metre per hour (kg/m2/h). It matters because plastic shrinkage cracks form when surface moisture evaporates faster than rising bleed water can replace it.

Contractors check it on hot, dry or windy days, before a slab, deck or pavement is placed and again while it is being finished. It is a short-term placement check, not a measure of strength, curing time or mix quality. The rate describes the first hours while the concrete is still plastic; it does not say how long to cure or what water-cement ratio to use.

How the Concrete Evaporation Rate Calculator Works

Formula: E = (Tc^2.5 - r x Ta^2.5) x (1 + 0.4 x V) x 10^-6

E is the evaporation rate in lb/ft2/h, Tc is the concrete (water surface) temperature in degrees Fahrenheit, Ta is the air temperature in degrees Fahrenheit, r is the relative humidity divided by 100, and V is the wind speed in miles per hour. The calculator converts metric entries to these units first, so the result is the same in either unit system.

  1. Convert temperatures to deg F and wind to mph if you chose metric.
  2. Raise the concrete temperature and the air temperature to the power 2.5, and weight the air term by the humidity fraction.
  3. Subtract the air term from the concrete term, multiply by (1 + 0.4 V), then multiply by one millionth.
  4. Multiply by 4.88243 to give kg/m2/h, and compare with the 0.1 and 0.2 lb/ft2/h levels.

The same source also prints a metric version, E = 5 ([Tc + 18]^2.5 – r [Ta + 18]^2.5)(V + 4) x 10^-6, with temperatures in deg C and wind in km/h. For the cases we checked it lands within about 4 percent of the English-units form, so this tool uses one form for both unit systems rather than letting the answer drift when you switch.

Concrete Evaporation Rate Example

Suppose the concrete and the air are both 80 F, the relative humidity is 50% and the wind is 10 mph.

Calculation: 80^2.5 = 6,400 x 8.944 = 57,243. The air term is 0.5 x 57,243 = 28,622, so the difference is 57,243 – 28,622 = 28,622. The wind factor is 1 + 0.4 x 10 = 5. E = 28,622 x 5 x 10^-6 = 0.143 lb/ft2/h, which is 0.699 kg/m2/h.

That is 72 percent of the 0.2 lb/ft2/h level and sits in the 0.1 to 0.2 band where plastic shrinkage cracking may occur. Dropping the wind to 5 mph brings the rate to 0.086, below the 0.1 level, which shows how much a windbreak can matter.

Factors That Change the Evaporation Rate

Four inputs drive the number, and small changes in any one of them can move it a long way. The table starts from the example above (0.143 lb/ft2/h) and changes one input at a time.

Change from the exampleRate (lb/ft2/h)Band
Wind 0 mph (still air)0.029Below 0.1
Wind 5 mph0.086Below 0.1
Wind 15 mph0.200About the 0.2 level
Humidity 80%0.057Below 0.1
Humidity 30%0.200About the 0.2 level
Concrete 70 F0.062Below 0.1
Concrete 90 F0.241Above 0.2

Wind Speed

Wind scales the whole result through the (1 + 0.4 V) term, so doubling the wind from 5 to 10 mph raises the rate by two thirds in this example. A windbreak is one of the measures the NRMCA sheet lists.

Relative Humidity

Drier air pulls more water from the surface. Falling from 50 to 30 percent humidity raises the rate by about 40 percent with nothing else changed.

Concrete Temperature

Hot concrete evaporates faster. Cooling the mix, or shading the subgrade and forms, lowers the first term of the formula directly.

Air Temperature

By this formula, warmer air at the same humidity holds more moisture, so on its own it lowers the rate. In practice hot air also warms the concrete, so enter both readings you actually measure.

If you are using a fast-setting product, follow its data sheet and see the fast setting concrete calculator for quantities. For a tall pour, the concrete wall calculator sizes the volume so you can plan crews and timing.

Evaporation Rate vs Curing Time and Water-Cement Ratio

Three nearby calculators answer different questions, and mixing them up is a common source of confusion.

QuestionToolWhen it applies
Is the surface drying faster than bleed water can replace it right now?This calculatorWhile placing and finishing, the first hours
How many days should the concrete stay moist or covered?Concrete curing time calculatorAfter finishing, over days
How much water is in the mix compared with cement?Water cement ratio calculatorAt mix design and batching

A mix can have an excellent water-cement ratio and a long curing plan and still crack in the first hour if the surface dries too fast. The evaporation rate is the early warning; curing starts afterwards and covers a different period.

When to Use an Evaporation Rate Check

Planning a Hot-weather Pour

Before ordering, run the forecast conditions through the tool. If the result is near or above 0.2 lb/ft2/h, schedule the pour for early morning or evening, and line up windbreaks, sunshades or fog sprays.

Deciding When to Start Protection

On the day, re-enter the actual readings. Conditions change through the day, so a rate that was fine at 7 am can be well over the level by noon.

Reading a Specification

Many project specifications set an evaporation limit. The tool shows the same figure in lb/ft2/h and kg/m2/h so you can compare it with the limit your project uses. If the mix itself is the question, start with the concrete mix calculator, and size the pour with the concrete calculator.

Common Mistakes with Evaporation Rate Estimates

1. Using the Air Temperature for the Concrete

The formula needs the concrete temperature as well. Fresh concrete on a hot day can be well above or below the air, and the difference changes the answer a lot.

2. Using a Forecast Wind Instead of Site Wind

A forecast or distant station may not match conditions over your slab. Measure at the surface where you are working.

3. Treating the Result as a Crack Prediction

The rate is an estimate of water loss from a free water surface. A low number does not guarantee no cracks, and a high one does not guarantee them.

4. Checking Only Once

Humidity, wind and sun change during a pour. Re-check when conditions shift and as finishing continues.

5. Mixing Up lb/ft2/h and kg/m2/h

The two units differ by a factor of about 4.88. The 0.2 lb/ft2/h level equals 0.98 kg/m2/h, which is why sources write it as about 1.0 kg/m2/h.

6. Skipping Protection Because the Rate Is Below the Level

Mixes with low bleeding, such as those with silica fume or a low water content, can crack at lower rates. Follow your mix supplier and specification as well as the number.

Accuracy and Limitations

The arithmetic is exact for the readings you enter; the figure it produces is an estimate of water loss, not a forecast of cracking.

What it calculates accurately

  • The evaporation rate from the formula for the values entered
  • Conversions between deg F and deg C, mph and km/h, lb/ft2/h and kg/m2/h
  • Where the rate sits against the 0.1 and 0.2 lb/ft2/h levels

What it does not account for

  • The actual bleeding rate of your mix; low-bleed mixes can crack at lower rates
  • Sun, surface cooling during evaporation and local gusts
  • That the formula models a free water surface, not a concrete surface; one source reports the older chart overpredicting by about 50 percent in one study and underestimating under some windy conditions
  • The valid range of the formula, which the sources reviewed do not state

How We Calculate the Evaporation Rate

Method
E = (Tc^2.5 – r x Ta^2.5)(1 + 0.4 V) x 10^-6, with E in lb/ft2/h, Tc and Ta in deg F, r as a fraction and V in mph.
Inputs used
Air temperature, relative humidity, concrete temperature and wind speed, in US or metric units.
Levels
0.1 lb/ft2/h (0.5 kg/m2/h) and 0.2 lb/ft2/h (about 1.0 kg/m2/h), tested in lb/ft2/h in both unit systems.
Conversions
deg F = deg C x 1.8 + 32; 1 mph = 1.609344 km/h; 1 lb/ft2 = 4.88243 kg/m2.
Assumptions
Water-surface evaporation; the concrete temperature stands in for the surface temperature; no sun or surface cooling correction.
Rounding
Rates to three decimals; the share of the 0.2 level to a whole percent; values converted by a unit switch to two decimals.
Edge cases
Blank inputs return a prompt; humidity must be 0 to 100; wind cannot be negative; temperatures at or below 0 deg F are blocked; a negative result is shown as zero.
Sources
See the Sources list below. The formula text comes from one secondary source and was not checked against ACI 305R itself.
Last reviewed
2026-10-21.

Frequently Asked Questions About Concrete Evaporation Rate

What evaporation rate is too high for concrete?

Cited guidance treats more than 0.2 lb/ft2/h (about 1.0 kg/m2/h) as the level where plastic shrinkage cracks are expected, and 0.1 to 0.2 lb/ft2/h as the range where they may occur. One FHWA report calls 0.5 kg/m2/h a condition that warrants caution.

What is the evaporation rate formula for concrete?

E = (Tc^2.5 – r x Ta^2.5)(1 + 0.4 V) x 10^-6, with temperatures in deg F, wind in mph and r as humidity divided by 100. It gives lb/ft2/h and is the graphical nomograph written as an equation.

Why does hot concrete evaporate faster than warm air?

The first term of the formula depends on the concrete temperature raised to the power 2.5, so a warmer surface drives much more water vapor into the air. In the example, raising the concrete from 80 to 90 F lifts the rate from 0.143 to 0.241 lb/ft2/h.

Can plastic shrinkage cracks form below 0.2 lb/ft2/h?

Yes. Mixes that bleed little, such as those with high cementitious content, high fines, reduced water or silica fume, can crack at lower rates. The Caltrans manual notes the threshold for precautions can be much lower for modern concrete.

How do I lower the evaporation rate on site?

Erect temporary windbreaks, dampen the subgrade and forms, use fog sprays, and cover the surface between finishing operations, as the NRMCA sheet lists. The Caltrans manual also lists sunshades and cooling the mix in extreme conditions.

Does the tool give the same answer in metric and US units?

Yes. It converts metric entries to deg F and mph, applies one formula, then converts the result, so switching units changes only the units. The published metric version of the formula differs from it by about 4 percent in our checks.

What wind speed matters for plastic shrinkage?

The NRMCA sheet lists wind over 5 mph among the conditions that raise evaporation. In the example here, going from 5 to 15 mph more than doubles the rate, from 0.086 to 0.200 lb/ft2/h.

Why is my result zero?

The formula can go negative when the air term exceeds the concrete term, for example cool concrete in warm, humid air. A negative rate would mean condensation rather than drying, so the tool shows zero and the good band.

Where do I measure the inputs?

Measure air temperature and humidity at the placement, concrete temperature in the mix, and wind at the surface. Handheld weather meters are used for this, as the FHWA brief notes.

Is my data saved?

No. The calculation runs entirely in your browser and nothing you enter is stored or sent anywhere.

Sources

Related Calculators

Planning a pour in hot or windy weather?

Explore all concrete calculators

This calculator is for general planning only and is not engineering advice. It estimates the evaporation rate of water from a free water surface and does not predict whether a particular slab will crack. For structural work, follow your project specification, the guidance of the concrete supplier and a qualified engineer. Spotted an error? Let us know.