Concrete Volume & Ordering Calculators

Concrete volume and ordering is the part of a pour where an estimate becomes a purchase: the cubic yards, bags, cement, water and truck loads you must buy before the first shovel of concrete goes in. This page collects the free GeniesMag tools for that step, from a basic volume estimate to a pump budget, so you can decide how much to order and how to buy it.

Each calculator runs in your browser and shows its formula and sources. Pick the tool that matches your question, or read the ordering guide below.

Volume, Mix and Cost Calculators

These tools answer the planning questions: how much concrete, what goes into it, what it weighs and what it costs, including shotcrete and flowable backfill.

Bagged Concrete Calculators

Bagged concrete suits small jobs, awkward access and repairs. These tools count bags, batches and pallets, and help you decide when a delivery makes more sense.

How Concrete Ordering Works

Ordering is a chain of conversions. You start with a volume, turn it into bags or yards, choose how it arrives, and then plan how it gets into the forms. The volume formula lives on the concrete calculators main page, so this starts after you have a number.

Step 1: Convert volume to bags

Bags are sold by weight but filled by volume. For QUIKRETE Concrete Mix 1101, an 80 lb bag yields 0.60 cubic feet, a 60 lb bag yields 0.45 and a 40 lb bag yields 0.30. QUIKRETE Fast-Setting Concrete Mix yields about 0.375 cubic feet per 50 lb bag. Other brands differ. Divide your volume by the yield and round up.

Bag count: bags = volume in cubic feet x (1 + waste) / bag yield, rounded up to a whole bag.

Step 2: Decide between bags and ready-mix

Ready-mix arrives mixed and is priced by the cubic yard, but suppliers add fees for delivery and for small or part loads, and those fees vary by region and supplier. The bagged vs ready-mix calculator puts both totals side by side using your own prices.

Step 3: Plan trucks and pumping

For ready-mix, the number of loads depends on your volume and the load size your supplier uses, so confirm that with them. The concrete truck calculator rounds loads up and spaces them by how fast your crew can place concrete, so one load does not stiffen while the next waits. If a truck cannot reach the forms, a pump adds a setup charge plus time and per-yard fees.

A worked example

Say you are pouring a 12 by 20 foot slab, 4 inches thick, with 10 percent waste. The volume is 12 x 20 x (4 / 12) = 80 cubic feet. With waste that becomes 80 x 1.10 = 88 cubic feet, or 88 / 27 = 3.26 cubic yards.

In 80 lb bags, that is 88 / 0.60 = 146.7, so 147 bags, weighing 147 x 80 = 11,760 lb on the label. In 60 lb bags it is 88 / 0.45 = 195.6, so 196 bags. If your supplier stacks 80 lb bags 42 to a pallet, 147 bags is 3.5 pallets, so you buy 4. A mixer that handles about 3 bags a batch would need roughly 49 batches.

Mix ratios, cement and water

If you batch from raw materials instead of premixed bags, the concrete mix calculator splits the volume by a ratio such as 1:2:4 (cement : sand : gravel). It converts wet volume to dry volume with a factor of 1.54, because loose materials take more space than the finished concrete. For that same 88 cubic feet, the dry volume is 88 x 1.54 = 135.52 cubic feet, and cement is 135.52 / 7 = 19.4 cubic feet. The cement calculator treats one 94 lb Portland bag as about 1 cubic foot, so that is 20 bags after rounding up. Nominal ratios are rules of thumb for small, non-structural work; structural pours need a designed mix.

Water matters as much as cement. The water-cement ratio is the weight of water divided by the weight of cement: 300 lb of water on 600 lb of cement is 0.50. A lower ratio generally means stronger concrete, and the water cement ratio calculator gives an approximate 28-day strength from the ACI relationship.

Weight and coverage

Normal-weight concrete runs about 150 lb per cubic foot, so the 88 cubic feet above weighs roughly 13,200 lb, about 6.6 short tons. The concrete weight calculator checks it against a payload. To work backward from a quantity you already have, the concrete coverage calculator shows how far a yard or a stack of bags will go at a given thickness.

Specialty placements

Some placements need extra material. Shotcrete rebounds off the surface, and the American Shotcrete Association says rebound may be estimated at 5 to 15 percent, averaging about 10 percent, with ACI 506R citing total losses of 10 to 30 percent. The shotcrete calculator adds it. Flowable fill is a self-leveling backfill that can be delivered in ready-mix trucks, and ACI 229R defines it by a compressive strength of 1,200 psi or less. The flowable fill calculator sizes trenches and voids.

Common Mistakes

Judging bags by weight, not yield

An 80 lb bag fills only 0.60 cubic feet. Buying by weight alone, or assuming a pallet goes further than it does, leaves you short mid-pour.

Ignoring fixed costs on small orders

A small delivery, a part load or a pump can carry charges that do not shrink with the order. Compare totals, not yard prices.

Adding water to make it easier

Extra water eases placing but raises the water-cement ratio, which generally lowers strength. Add water only within the limits of your mix design.

Frequently Asked Questions

How many 80 lb bags make a cubic yard?

An 80 lb bag of QUIKRETE Concrete Mix 1101 yields 0.60 cubic feet, so a 27 cubic foot yard needs 27 / 0.60 = 45 bags. The concrete bag calculator also handles 60 lb and 40 lb bags.

When does ready-mix beat bagged concrete?

As the volume grows, bag counts and mixing time climb quickly, while delivery fees stay fixed. There is no single switch-over point, because prices vary by region and supplier. Enter your own numbers into the bagged vs ready-mix calculator.

What is a short load?

A short load is a ready-mix delivery smaller than the supplier’s minimum, usually billed with an extra fee. Your supplier sets the minimum; the concrete cost calculator has a line for it.

Do I need a concrete pump?

You usually need one when a truck cannot get close enough to the forms or the concrete must travel far or high. Run the numbers in the concrete pump cost calculator and get a written quote.

How many batches will my mixer need?

A portable mixer holds less than its drum size, because the material must tumble. Retailer listings for a 3.5 cubic foot drum suggest roughly 1.8 to 2 cubic feet mixed per batch, so treat that as a planning figure. The concrete mixer calculator turns that into batches and bags per batch.

How many pallets of concrete should I buy?

Divide your bag count by the bags per pallet. For QUIKRETE Concrete Mix 1101, that is 80 per pallet for 40 lb bags, 56 for 60 lb bags and 42 for 80 lb bags, though counts can vary by retailer. The concrete pallet calculator shows full pallets and loose bags.

How many bags of fast-setting concrete do I need for a post?

The hole volume divided by about 0.375 cubic feet per 50 lb bag, minus the space the post takes up, then rounded up. The fast-setting concrete calculator does the arithmetic.

Related Guides

These guides go with the calculators on this page. They explain the method, timing and code limits behind the numbers, and each lists its sources. See all construction guides.

How Much Water per Bag of Concrete?Starting and maximum water for 40, 50, 60, 80 and 90 lb bags from one data sheet, how to judge consistency, and what extra water costs.Ready-Mix vs Bagged Concrete: How Much Work Is a Yard?What a cubic yard asks of you: 45 bags and 3,600 lb of dry mix, mixer batches, ordering rules and truck access. No prices.How Long Should You Mix Concrete in a Mixer?Water first, the 3 to 5 minute how-to range, the consistency check and the mixing times printed for different QUIKRETE products.What Is Flowable Fill (CLSM) and When Should You Use It?What flowable fill is, its strength and bearing figures, placement, hardening time, density and limits, from NRMCA and archived FHWA guidance.40 lb vs 60 lb vs 80 lb Concrete Bags: Which Size Should You Buy?Yield per bag from QUIKRETE and Sakrete data sheets, bags per cubic yard as arithmetic, mixer capacity and carry weight. No prices.Concrete vs Cement vs Mortar: What’s the Difference?Cement is the binder, concrete is cement plus sand and gravel, and mortar bonds masonry units. Which bag to buy for each job.Shotcrete vs Gunite: What’s the Difference?The American Shotcrete Association says gunite names only the dry-mix process. How wet-mix and dry-mix differ and where each is used.Line Pump vs Boom Pump: Which Is Right for Your Job?What the ACPA study guide and two named Putzmeister models say about hose sizes, aggregate limits, reach and power line safety.How Many Bags of Concrete Are on a Pallet?Pallet counts printed by Sakrete and QUIKRETE for 40, 60 and 80 lb bags, plus bags-only weight arithmetic.What PSI Concrete Do You Need for Patios, Driveways and Footings?The 2021 IRC strength and air-entrainment table by element and weather, what NRMCA adds for exterior slabs, and what bagged mixes state.How Long Can Concrete Stay in the Truck Before It Goes Bad?What ASTM C94 says about the 90-minute discharge limit, hot and cold weather and retempering, with no single goes-bad minute.Portland Cement Types I, II, III and V ExplainedThe four basic ASTM C150 types, what each resists, plus air-entraining and ASTM C595 blended cements.What Is Lightweight Concrete?The ACI and AASHTO density ceilings, CIP 36 ranges and the all-, sand- and specified-density types, each by source.

More Concrete Calculators

Once you know how much to order, move on to the shape you are pouring.

Ready to order? Start with the concrete calculator, then choose bags or ready-mix.