Flowable Fill Calculator

Quick answer

A flowable fill calculator works out how much controlled low-strength material, or CLSM, a trench or void needs. It multiplies the dimensions for the volume and divides by 27 for cubic yards. A 100 by 2 by 3 foot trench holds about 22.2 cubic yards, plus a small waste allowance.

Updated 2026-10-17By Shakeel Muzaffar | Reviewed by Prof. Dr. Khalil Mudassar, PhD
Try
Your details
Concrete and Cement
Rectangular uses length, width and depth. Round uses the diameter and length.
ft
Trench or void length in feet. Round shape uses this as the pipe length.
ft
Trench or void width in feet. Rectangular shape only.
ft
Trench or void depth in feet. Rectangular shape only.
in
Round void or abandoned pipe inside diameter in inches. Round shape only.
Number of identical voids.
%
Extra for over-break and spillage. Flowable fill flows into every gap, so a small allowance is usually enough.
Excavatable stays weak so it can be removed later; structural is stronger permanent support. This sets the strength note, not the volume.
Your results

Flowable fill to order

—
Volume (cubic feet)—
Volume (cubic meters)—
Without waste—
Suggested strength—

Calculations run in your browser. Inputs are not sent to our servers; anything you Save stays in this browser only.

Saved results (0)
Calculator GuideMethod, worked examples, factors and FAQ

How to Use the Flowable Fill Calculator

  1. Choose the void shape: a rectangular trench or a round void or pipe.
  2. Enter the dimensions in feet (round uses the diameter in inches and the length in feet).
  3. Set the quantity and a small waste allowance.
  4. Pick the fill type, excavatable or structural, for the strength note, then read the cubic yards to order.

Here is what each result means:

ResultWhat it means
Flowable fill to orderVolume of CLSM in cubic yards, including the waste allowance.
Volume (cubic feet / meters)The same volume in other units.
Without wasteThe raw void volume before the allowance.
Suggested strengthA typical strength range for the fill type you chose.

What Is Flowable Fill?

Flowable fill, known in the standard as controlled low-strength material or CLSM, is a self-leveling, self-compacting cementitious mixture used to fill trenches, voids, abandoned pipes and hard-to-reach spaces. It is placed like concrete but is much weaker, so it flows into every gap without compaction.

Because it flows and self-levels, you size it by the volume of the void, just like concrete, and order it by the cubic yard from a ready-mix supplier. What makes it different is the strength: it is deliberately low, and whether it should be excavatable or structural changes the mix, though not the volume.

How the Flowable Fill Calculator Works

Flowable fill (cubic yards)
V = LWD27

The volume is the void dimensions multiplied together, divided by 27 for cubic yards. Because flowable fill reaches every corner, a small waste allowance for over-break is usually enough.

  1. Multiply length by width by depth for a trench, or pi times radius squared times length for a round void.
  2. Multiply by the quantity of identical voids.
  3. Divide by 27 for cubic yards, and add a small waste allowance.
Worked example: 100 ft x 2 ft x 3 ft trench
V = 1002327 = 60027 = 22.2

Flowable Fill Example

Suppose you are backfilling a 100 foot trench, 2 feet wide and 3 feet deep, with excavatable CLSM and a 5 percent waste allowance.

Calculation: volume = 100 x 2 x 3 = 600 cu ft = 22.2 cu yd. With 5 percent waste, order about 23.3 cu yd. As an excavatable mix, keep it under about 150 psi so the trench can be dug out later if the utility needs access.

The same trench filled with structural CLSM would be the same volume but a stronger, permanent mix that is not meant to be re-excavated.

Excavatable vs Structural Flowable Fill

The volume is the same either way; the difference is the strength, which decides whether the fill can be dug out later. ACI 229R defines CLSM as reaching 1,200 psi or less.

TypeTypical strengthUse
Excavatable, hand toolsunder about 100 psiWhere it may be dug out by hand later
Excavatable, machineunder about 150 psiRemovable with a backhoe later
Structural (non-excavatable)about 300 to 1,200 psiPermanent support under slabs and pavements

Excavatability is often specified at a late age, such as 90 days to a year, because the strength keeps rising. Set the target and test age in the project specification, not by this guide alone.

Factors That Change the Quantity

Over-break

A trench rarely cuts to the exact design width, so the real void is a little larger. The waste allowance covers this; raise it for rough or collapsing ground.

Existing Pipes and Obstructions

Pipes, conduits and bedding inside the void displace fill. Subtract their volume if they are significant, or you will over-order.

Shape and Corners

Break an irregular void into trenches and round sections, calculate each and add them, rather than guessing one average size.

Settlement and Bleed

Some mixes settle or bleed a little as they set. A modest allowance and a topped-up finish handle it.

When to Use Flowable Fill

Backfilling Trenches

Fill utility and pipe trenches quickly without compacting in layers, and with less settlement than soil.

Abandoning Pipes and Tanks

Fill an abandoned pipe, culvert or tank so it cannot collapse, using the round shape for the volume.

Filling Voids Under Slabs

Support a slab or pavement over a void or soft spot with a structural mix that will not be dug out.

Common Mistakes with Flowable Fill

1. Ordering Structural When You Need Excavatable

A fill that is too strong cannot be dug out, which is a problem over a live utility. Match the type to future access.

2. Ignoring Over-break

The real void is larger than the design trench. Add a waste allowance or you will run short.

3. Forgetting Pipes Inside the Void

Large pipes and bedding take up space. Not subtracting them over-orders the fill.

4. Judging Excavatability at 28 Days

CLSM keeps gaining strength. A mix that is diggable at 28 days may not be at a year, so specify a late test age.

5. Treating It as Structural Concrete

Flowable fill is low strength by design. It is not a substitute for structural concrete or a designed footing.

Accuracy and Limitations

The volume arithmetic is exact for the dimensions you enter; the strength note is a typical range, not a mix design.

What it calculates accurately

  • Void volume in cubic yards, feet and meters
  • The order quantity with a waste allowance
  • A typical strength range for the fill type

What it does not account for

  • Over-break beyond your allowance, or an irregular void
  • Pipes and obstructions inside the void
  • The mix design, strength and set time for your job
  • Settlement, bleed and the specified test age

How We Calculate the Flowable Fill

Method
Void volume = length x width x depth, or pi x radius squared x length for a round void, times the quantity; divided by 27 for cubic yards, plus a waste allowance.
Inputs used
Void shape and dimensions, quantity, waste, and the fill type (excavatable or structural).
Strength note
Excavatable under about 150 psi (hand tools under about 100); structural about 300 to 1,200 psi. CLSM is 1,200 psi or less (ACI 229R).
Conversions
27 cubic feet per cubic yard; 1 cubic foot = 0.0283 cubic meters; round diameter in inches, lengths in feet.
Rounding
Cubic yards and feet to two decimals; cubic meters to three.
Edge cases
Zero or blank dimensions returns a prompt; a non-positive volume is blocked.
Sources
ACI 229R and NRMCA. See Sources below.
Last reviewed
2026-11-03.

Frequently Asked Questions About the Flowable Fill Calculator

How much flowable fill do I need?

Multiply the void dimensions for the volume and divide by 27 for cubic yards. A 100 by 2 by 3 foot trench is about 22.2 cubic yards, or 23.3 with a 5 percent waste allowance. CLSM is ordered by the cubic yard like concrete.

What is flowable fill (CLSM)?

Flowable fill, or controlled low-strength material, is a self-leveling cementitious mixture for backfilling trenches, voids and abandoned pipes. It flows into every gap without compaction and is much weaker than structural concrete.

What is the difference between excavatable and structural CLSM?

Excavatable CLSM stays weak, under about 150 psi, so it can be dug out later; structural CLSM is stronger, about 300 to 1,200 psi, for permanent support. The volume you order is the same; the mix differs.

How strong is flowable fill?

ACI 229R defines CLSM as reaching 1,200 psi or less. Excavatable mixes are usually kept under about 150 psi, with hand-tool mixes under 100, while structural fill runs 300 psi and up.

Do I need a waste allowance for flowable fill?

A small one, often around 5 percent, for over-break where the trench is wider than designed. Because flowable fill self-levels into every gap, you rarely need the larger allowance a hand-placed material would.

Can I fill an abandoned pipe with flowable fill?

Yes. Use the round shape with the pipe diameter and length to get the volume. Flowable fill is a common way to fill abandoned pipes and culverts so they cannot collapse.

Should I subtract pipes inside the trench?

Yes, if they are large. Pipes, conduits and bedding take up space in the void, so subtract their volume from the trench volume to avoid over-ordering.

Is flowable fill the same as concrete?

No. It is a low-strength, high-flow material for filling and support, not a structural concrete. It uses less cement and much more fine material or fly ash, and is not compacted.

Is my data saved?

No. The calculation runs entirely in your browser and nothing you enter is stored or sent anywhere.

Sources

Related Calculators

Backfilling with flowable fill?

Explore all concrete calculators

This calculator is for general planning only and is not engineering advice. Flowable fill, also called CLSM, is specified by strength and excavatability for the job. Follow ACI 229R, your project specification and a qualified engineer, and confirm the mix and quantities with your supplier before you order. Spotted an error? Let us know.