Quick answer

A fast-setting concrete calculator works out how many 50 pound bags you need to set a post or fill a hole. It finds the hole volume, subtracts the post, and divides by the 0.375 cubic foot yield of a 50 pound bag. A 6 inch post in an 18 inch hole, 24 inches deep, takes about 9 bags.

Updated 2026-10-17By Shakeel Muzaffar | Reviewed by Prof. Dr. Khalil Mudassar, PhD
Try
Your details
Concrete and Cement
How many identical holes you are filling.
in
The hole diameter in inches. A rule of thumb is three times the post diameter.
in
The hole depth in inches. A rule of thumb is one-half the above-ground post height.
The post takes up space in the hole, so its volume is subtracted. Choose No post to fill the whole hole.
in
Post diameter for a round post, or the side for a square post, in inches. Ignored for No post.
cu ft
Cubic feet per bag. A 50 lb bag of fast-setting concrete yields about 0.375; change it for another product.
%
Extra for spillage and slightly oversized holes. 5 to 10 percent is typical.
Your results

Fast-set bags needed

—
Bags per hole—
Concrete per hole—
Total concrete—
Total (cubic yards)—

Calculations run in your browser. Inputs are not sent to our servers; anything you Save stays in this browser only.

Saved results (0)
Calculator GuideMethod, worked examples, factors and FAQ

How to Use the Fast Setting Concrete Calculator

  1. Enter the number of posts or holes.
  2. Enter the hole diameter and depth in inches (rules of thumb: hole three times the post, depth half the above-ground height).
  3. Pick the post shape and size so its volume is subtracted, or choose No post to fill the whole hole.
  4. Adjust the bag yield and waste if needed, then read the bags.

Here is what each result means:

ResultWhat it means
Fast-set bags neededTotal 50 lb bags, counted per hole and multiplied by the number of holes.
Bags per holeWhole bags for one hole, rounded up.
Concrete per holeThe concrete that fills one hole around the post, in cubic feet.
Total concreteAll holes together, in cubic feet and cubic yards.

What Is Fast-Setting Concrete?

Fast-setting concrete is a pre-mixed concrete with an accelerator, sold in 50 pound bags, that sets hard in 20 to 40 minutes. It is made for setting posts: fence, mailbox, deck, sign and basketball posts.

Its selling point is the no-mix method. You stand the post in the hole, pour the dry mix in around it, then add water to the dry mix in the hole, with no mixing in a barrow or mixer. Because you fill the hole, you size it by the hole volume, minus the space the post takes. A 50 pound bag yields about 0.375 cubic feet of concrete.

How the Fast Setting Concrete Calculator Works

Bags per hole (50 lb fast-set)
bags = hole volume – post volume0.375

The hole is a cylinder, so its volume is pi times the radius squared times the depth. The post displaces some of that volume, so it is subtracted. Dividing by the 0.375 cubic foot bag yield gives the bags, rounded up.

  1. Find the hole volume: pi times the hole radius squared times the depth, in feet.
  2. Subtract the post volume, for a round or square post of the same depth.
  3. Add a waste allowance, divide by 0.375 cubic feet per bag, and round up for one hole.
  4. Multiply by the number of holes for the total.
Worked example: 18 in hole x 24 in deep, 6 in post
bags = 3.140.375 = 8.4 -> 9

Fast-Setting Concrete Example

Suppose you are setting a 6 inch round post in an 18 inch diameter hole, 24 inches deep.

Calculation: hole volume = pi x (9/12)^2 x (24/12) = 3.53 cu ft. The post takes pi x (3/12)^2 x 2 = 0.39 cu ft, leaving 3.14 cu ft. Dividing by 0.375 is 8.4, so 9 bags per hole, which matches the manufacturer guidance.

Pour those bags in dry around the post, then add water: the no-mix method. For several posts, multiply the per-hole bags by the number of holes.

Fast-Setting vs Standard Concrete for Posts

Both set posts, but they work differently. Fast-setting is made for the no-mix method and speed; standard bagged concrete is mixed and cheaper per bag.

FeatureFast-settingStandard bagged
Set time20 to 40 minutesHours
MethodNo-mix: dry in the hole, then waterMix first, then place
Bag and yield50 lb, about 0.375 cu ft40 to 80 lb, 0.30 to 0.60 cu ft
Best forSetting posts quicklySlabs and larger pours

For a slab or a larger pour, the concrete bag calculator and standard mix are usually the better value.

Factors That Change the Bag Count

Hole Size

The diameter matters most, because volume rises with the square of the radius. A slightly wider hole takes noticeably more concrete.

Post Size and Shape

A bigger post displaces more concrete, lowering the count. A square post of the same width displaces more than a round one.

Bag Yield

Yields differ by product. The 0.375 cubic feet here is for 50 lb fast-setting concrete; change it if your bag states another figure.

Waste and Oversized Holes

Augered holes are rarely exact, and some mix spills. A small allowance covers it.

When to Use Fast-Setting Concrete

Setting Posts

Fence, mailbox, deck, sign and basketball posts, where a quick set lets you move on the same day.

The No-mix Method

Where mixing is awkward, pour the dry mix into the hole around the post and add water, with no barrow or mixer.

Repairs That Cannot Wait

Small, time-critical fixes where standard concrete would set too slowly.

Common Mistakes with Fast-Setting Concrete

1. Forgetting to Subtract the Post

The post fills part of the hole. Ignoring it over-orders, though a small surplus is no bad thing.

2. Mixing It First

Fast-setting concrete is made for the no-mix method and sets fast. Mixing a batch can leave it setting before you place it.

3. Too Little Water

Follow the directions for water added to the hole. Too little leaves dry pockets that never gain strength.

4. Hole Too Small

A hole about three times the post diameter gives enough concrete around the post. A tight hole is weak and hard to fill evenly.

5. Using It for a Slab

Fast-setting concrete is for posts and repairs. For a slab, use standard concrete and the concrete calculator.

Accuracy and Limitations

The arithmetic is exact for the hole and post sizes you enter; the bag count depends on the real yield and how the hole is dug.

What it calculates accurately

  • Concrete per hole, net of the post
  • Bags per hole and in total, rounded up
  • Total volume in cubic feet and yards

What it does not account for

  • Yields that differ from 0.375 cubic feet
  • Over-dig and irregular or belled holes
  • Gravel at the base of the hole
  • Water, tools and set time

How We Calculate the Bags

Method
Hole volume = pi x radius squared x depth; minus the post volume; plus waste; divided by the bag yield, rounded up per hole, times the number of holes.
Inputs used
Number of posts, hole diameter and depth, post shape and size, bag yield and waste.
Bag yield
A 50 lb bag of fast-setting concrete yields about 0.375 cubic feet (manufacturer data); adjustable.
Conversions
Inches / 12 for feet; 27 cubic feet per cubic yard; post the same depth as the hole.
Rounding
Bags rounded up per hole; volumes to two or three decimals.
Edge cases
Zero or blank hole size returns a prompt; a post that fills the hole is blocked.
Sources
See the Sources list below.
Last reviewed
2026-11-03.

Frequently Asked Questions About the Fast Setting Concrete Calculator

How many bags of fast-setting concrete per post?

It depends on the hole. A 4 inch post in a 10 inch hole about 2 feet deep takes 2 to 3 bags, while a 6 inch post in an 18 inch hole 2 feet deep takes about 9. Enter your hole and post size for the exact count.

What is the yield of a 50 lb bag of fast-setting concrete?

About 0.375 cubic feet of mixed concrete, the same as a standard 50 pound bag. A cubic foot takes between two and three bags, and a cubic yard about 72.

How do you use fast-setting concrete for a post?

Stand the post in the hole, pour the dry mix in around it to about 3 to 4 inches below grade, then add water to the dry mix in the hole. Do not mix it first. It sets hard in 20 to 40 minutes.

How big should the hole be for a post?

A common rule is a hole about three times the post diameter, and a depth of about one-half the above-ground post height. A 4 inch post then takes roughly a 10 to 12 inch hole.

Do I subtract the post from the hole volume?

Yes, for accuracy, because the post fills part of the hole. This calculator subtracts a round or square post. A small surplus of concrete is fine, so the exact subtraction is not critical.

Is fast-setting concrete stronger than regular concrete?

It reaches a working strength quickly and a comparable final strength, often around 4,000 psi at 28 days. The difference is speed, not a much higher final strength.

Can I use fast-setting concrete for a slab?

It is not ideal for slabs because it sets too fast to place and finish a large area. Use standard concrete and the concrete calculator for slabs.

How much water does fast-setting concrete need?

Follow the bag directions, typically a set amount poured over the dry mix in the hole. Too little water leaves weak, dry pockets; too much weakens the mix.

Is my data saved?

No. The calculation runs entirely in your browser and nothing you enter is stored or sent anywhere.

Sources

Related Calculators

This calculator is for general planning only and is not professional advice. Yields vary by product; a 50 lb bag of fast-setting concrete yields about 0.375 cubic feet. Follow the manufacturer directions for hole size, post depth and the no-mix method, and confirm the bag count on the bag you buy. Spotted an error? Let us know.