Grade Beam Calculator

Quick answer

A grade beam calculator works out the concrete and rebar for a grade beam, the reinforced beam that spans between piers or piles at ground level. It multiplies length by width by depth for the volume and estimates the longitudinal bars. A 20-foot beam, 12 by 24 inches, needs about 1.6 cubic yards of concrete.

Updated 2026-10-17By Shakeel Muzaffar | Reviewed by Prof. Dr. Khalil Mudassar, PhD
Try
Your details
Concrete and Cement
ft
Length of one grade beam, in feet.
in
Width of the beam, in inches.
in
Depth (height) of the beam, in inches.
How many identical beams you are pouring.
Total number of main bars running the length, top and bottom combined. From your engineer or local code.
in
Clear cover at the beam ends. ACI uses 3 inches for concrete cast against earth.
%
Extra for spillage and over-excavation. 10 percent is typical.
If buying bagged concrete. QUIKRETE Concrete Mix yields about 0.60 cu ft per 80 lb bag, 0.45 per 60 lb, 0.30 per 40 lb.
Your results

Concrete volume

—
Volume with waste—
Bags needed—
Longitudinal rebar length—
Cross section—

Calculations run in your browser. Inputs are not sent to our servers; anything you Save stays in this browser only.

Saved results (0)
Calculator GuideMethod, worked examples, factors and FAQ
How this calculator works1Your inputs2Verified formulameasurementfactor3Result
How it works: your measurements run through a verified formula to give the result.

How to Use the Grade Beam Calculator

  1. Enter the beam length in feet, and the width and depth in inches.
  2. Enter the number of beams and the number of longitudinal bars.
  3. Set the cover and a waste allowance.
  4. Read the concrete volume in cubic yards, the bag count, and the rebar estimate.

Here is what each result line means:

ResultWhat it means
Concrete volumeTotal concrete for all beams, in cubic yards, including waste.
Volume with wasteThe same volume in cubic feet, for bag counts and small pours.
Bags neededBags of the selected size to make that volume.
Longitudinal rebar lengthTotal length of the main bars running the beam, across all beams.

What Is a Grade Beam Calculator?

A grade beam calculator estimates the concrete and reinforcing steel for a grade beam. A grade beam is a reinforced concrete beam at or near ground level that spans between piers, piles or footings and carries a wall or column load across weak soil.

It multiplies the beam cross section by its length and the number of beams for the concrete, and totals the main longitudinal bars for the steel. To estimate the piers the beam spans between, use the Sonotube calculator for round pier forms.

How the Grade Beam Calculator Works

Grade beam concrete volume
volume = LWDcount

The concrete is the cross section times the length times the number of beams. The rebar is the main bars running the length, less the end cover.

  1. Convert the width and depth to feet and multiply by the length for one beam volume.
  2. Multiply by the number of beams and add the waste allowance.
  3. Divide by 27 to convert cubic feet to cubic yards.
  4. For rebar, multiply the number of longitudinal bars by the beam length less end cover, times the beam count.

The rebar figure covers the straight longitudinal bars only. Stirrups, laps and development lengths come from the structural drawings.

Grade Beam Example

Suppose you are pouring one grade beam 20 feet long, 12 inches wide and 24 inches deep, with 4 longitudinal bars, 3 inch cover, and a 10 percent waste allowance.

Worked example: 20 ft beam, 12 in wide, 24 in deep
volume = 20121 = 40 cu ft 1.63 cu yd with waste

Calculation: the cross section is 1 foot by 2 feet, so the beam is 20 times 1 times 2, which is 40 cubic feet. Adding 10 percent and dividing by 27 gives about 1.63 cubic yards. The rebar is 4 bars times about 19.5 feet, roughly 78 feet of bar.

The lesson: the cross section and length set the concrete, while the bar count sets the steel, so enter the values from your drawings.

Factors That Change Grade Beam Quantities

Cross Section

Width and depth multiply together, so a deeper or wider beam uses noticeably more concrete per foot of length.

Length and Beam Count

The total scales directly with how long the beams are and how many you pour. Count every run, including returns and short beams.

Longitudinal Bars

More main bars mean more steel. The number, top and bottom, comes from the structural design, not a rule of thumb.

Over-excavation and Waste

Grade beams are often cast against earth in a trench, so some extra concrete is normal where the trench is wider or deeper than planned.

Grade Beam vs Strip Footing

A grade beam and a strip footing both run in a line, but they work differently, which affects how they are built.

ElementHow it carries loadTypical use
Grade beamSpans between piers or piles like a beamWeak or expansive soil, deep foundations
Strip footingBears directly on the soil below itFirm soil under a continuous wall

A grade beam carries load across soft ground to the piers, so it is more heavily reinforced than a strip footing that simply rests on good soil.

When to Use a Grade Beam Calculator

Ordering Concrete

Turn beam sizes into cubic yards to order ready-mix, or bags for a small run.

Estimating Rebar

Get a planning figure for the main longitudinal steel.

Checking a Plan

Sanity-check a materials list against the drawings before pour day.

Common Mistakes with Grade Beams

1. Guessing the Size

Grade beam dimensions and reinforcement are designed for the span and load. Use the drawings, not a guess.

2. Counting Only the Longitudinal Bars

Stirrups add steel this tool does not estimate. Read the full rebar schedule for ordering.

3. Forgetting Over-excavation

Trenches are rarely exact. A waste allowance covers the extra concrete where the trench is oversized.

4. Using Too Little Cover

Concrete cast against earth needs about 3 inches of cover to protect the steel from the soil.

5. Confusing It with a Strip Footing

A grade beam spans between supports; a strip footing bears on soil. They are reinforced differently.

Accuracy and Limitations

The volume math is exact for the dimensions you enter. The rebar figure is a simple longitudinal estimate, and beam design is an engineering task.

What it calculates

  • Concrete volume and bags for one or more beams
  • The length of the main longitudinal bars
  • A waste allowance you set

What it does not do

  • Size the beam or its reinforcement
  • Include stirrups, laps or development lengths
  • Account for the piers or piles the beam spans between
  • Replace the structural drawings or local code

How We Calculate Grade Beam Quantities

Method
Volume = length x width x depth (in feet) x number of beams, plus a waste allowance, divided by 27 for cubic yards.
Rebar
Longitudinal only: number of main bars x (length minus end cover) x beam count.
Inputs used
Beam length, width, depth, beam count, longitudinal bar count, cover, waste, and bag size.
Constants
Bag yields 0.60, 0.45 and 0.30 cu ft (QUIKRETE); ACI cover 3 in for concrete cast against earth.
Rounding
Cubic yards to two decimals; bags and rebar rounded up or to the nearest whole unit.
Edge cases
Zero or blank length, width or depth returns a prompt; count defaults to 1, bars to 4, cover to 3 in, waste to 10%.
Sources
See the Sources list below.
Last reviewed
2026-10-22.

Frequently Asked Questions About Grade Beams

How much concrete does a grade beam need?

Multiply the length by the width and depth in feet, then by the number of beams, and add waste. A 20-foot beam, 12 by 24 inches, needs about 1.6 cubic yards, or around 74 eighty-pound bags, with 10 percent waste.

What is a grade beam?

A grade beam is a reinforced concrete beam at ground level that spans between piers, piles or footings. It carries a wall or column load across soft or expansive soil to the deeper supports.

How is a grade beam different from a footing?

A footing bears directly on the soil beneath it, while a grade beam spans between supports like a beam. Because it bridges weak ground, a grade beam is more heavily reinforced than a strip footing.

How much rebar is in a grade beam?

Grade beams have main longitudinal bars top and bottom, plus stirrups. This tool estimates the longitudinal bar length from the number you enter, but the full schedule, including stirrups and laps, comes from the structural drawings.

What size is a typical grade beam?

Sizes vary with the span and load, often from about 10 to 16 inches wide and 18 to 36 inches deep in residential work. Your engineer sets the exact size, so enter the specified dimensions.

How much cover does grade beam rebar need?

For concrete cast against and permanently exposed to earth, ACI uses 3 inches of clear cover. Grade beams are often poured in trenches against soil, so the tool defaults the cover to 3 inches.

Can I use bags instead of ready-mix?

For a short beam, yes, and the tool shows a bag count. Longer beams need a lot of concrete at once, so ready-mix is usually better for a continuous, monolithic pour.

How accurate is the estimate?

The concrete volume is exact for your dimensions. The rebar figure is a longitudinal-only planning estimate, so treat it as a guide and order from the full rebar schedule.

Is my data saved?

No. The calculation runs entirely in your browser and nothing you enter is stored or sent anywhere.

Sources
Reviewed and sourcedClear, comparable resultsReviewed and sourced
Every figure is checked against cited sources and reviewed by a qualified expert.

Related Calculators

This calculator estimates concrete and rebar quantities for planning only. It is not a structural design. Grade beam size and reinforcement must follow your engineer’s drawings and local code. The rebar figure is a simple longitudinal estimate and does not include stirrups or laps. Spotted an error? Let us know.