Road Base Calculator

Quick answer

A road base calculator turns the area and finished compacted depth of an aggregate base into the tons to order. It multiplies area by depth, divides by 324 for cubic yards, multiplies by the density near 1.5, then adds a compaction allowance for the volume lost under the roller. A 1,000 square foot road at 6 inches needs about 33 tons.

Updated 2026-10-17By Shakeel Muzaffar | Reviewed by Prof. Dr. Khalil Mudassar, PhD
Try
Your details
Site Work and Aggregates
sq ft
Surface area in square feet. Length times width. A 10 x 100 ft road strip is 1,000 sq ft.
inches
The compacted base depth you want after rolling, in inches. Driveways are about 4 in, roads 6 to 8 in, in 3 to 4 in lifts.
DOT names for the same dense-graded base. Class 2 (California), Class 5 (Minnesota), #21A (Virginia), ABC (Carolinas). All default to about 1.5 tons per cubic yard; override below.
ton/yd3
Optional. Enter your supplier loose bulk density in tons per cubic yard to replace the 1.5 default (range about 1.2 to 1.5).
Extra loose material ordered so the base reaches the finished depth after compaction. Dense-graded base loses 15 to 25 percent of its loose volume when rolled.
Your results

Loose Tons to Order

—
Cubic Yards (finished)—
Base Tons (before compaction)—
Density Used—
Base Class—
Compaction Added—
Coverage per Ton (at this depth)—

Calculations run in your browser. Inputs are not sent to our servers; anything you Save stays in this browser only.

Saved results (0)
Calculator GuideMethod, worked examples, factors and FAQ

How to Use the Road Base Calculator

  1. Enter the area to cover in square feet (length times width).
  2. Enter the finished depth you want after compaction, in inches.
  3. Pick the base class, or enter a density override from your supplier.
  4. Choose a compaction allowance and read the loose tons to order.

Here is what each result line means:

ResultWhat it means
Loose Tons to OrderTons to buy, with the compaction allowance added.
Cubic Yards (finished)Compacted volume, area times depth divided by 324.
Base TonsCubic yards times the density, before compaction.
Density UsedThe loose tons per cubic yard applied.
Base ClassThe DOT name and typical use.
Compaction AddedThe extra tons from the allowance.

For the same material under its driveway name, see the crusher run calculator.

What Is a Road Base Calculator?

A road base calculator is a material estimator for the compacted aggregate layer under a road, driveway or slab. It turns the area and the finished compacted depth into a volume in cubic yards and a weight in tons, then adds a compaction allowance so the delivery is enough after rolling.

Road base is dense-graded crushed stone with fines that interlock into a load-bearing layer. DOTs name it by class: Class 2 in California, Class 5 in Minnesota, #21A in Virginia and aggregate base course in the Carolinas. It is the same family as crusher run.

It shares the area-and-depth math of the crushed stone calculator, with the compaction step a base needs.

How the Road Base Calculator Works

depth is the finished compacted base depth; comp is the compaction allowance
loose tons = area x depth in / 324 x density x (1 + comp)

The divisor 324 folds 12 inches per foot and 27 cubic feet per cubic yard into one step (12 x 27 = 324). The depth you enter is the finished, compacted base depth.

Aggregate base in a road sectionthe aggregate base is what you sizesurface (asphalt, concrete or gravel)compacted aggregate base — 6 to 8 inplaced in 3 to 4 in liftsprepared subgradebaseorder loose tons = base tons x (1 + compaction allowance), ~20 percent
The aggregate base carries the load between the subgrade and the surface. You enter its finished compacted depth; the tool adds a compaction allowance so the loose delivery is enough after rolling.
  1. Cubic yards = area in square feet times the finished depth in inches, divided by 324.
  2. Base tons = cubic yards times the density, about 1.5 tons per cubic yard.
  3. Loose tons to order = base tons times one plus the compaction allowance, about 20 percent.
How road base tonnage is calculatedvolume, to base tons, plus compactionarea x depth/ 324cubic yardsx density 1.5base tonsx (1 + comp%)~20%loose tonsorder
Area times finished depth divided by 324 gives cubic yards, the density gives base tons, and the compaction allowance gives the loose tons to order.

Suppliers sell by the loose ton, so the allowance makes sure the delivery reaches the finished depth after rolling. On a real road the base is tested to a relative-compaction spec.

Road Base Calculation Example

A 1,000 sq ft road with a 6 in finished base of Class 2 aggregate, density 1.5, with a 20 percent compaction allowance.

1000 sq ft road at 6 in finished, density 1.5, 20 percent compaction
loose tons = 1000 x 6 / 324 x 1.5 x 1.20 = 33.33

Calculation: Volume = 1,000 x 6 / 324 = 18.52 cubic yards. Base tons = 18.52 x 1.5 = 27.78. Loose tons = 27.78 x 1.20 = 33.33 tons to order.

A 500 sq ft driveway at 4 in needs about 11 tons. With the workbook 15 percent factor the road is 27.78 x 1.15 = 31.9 tons.

Factors That Affect How Much Road Base You Need

Finished Depth

Depth sets the volume. A driveway base is about 4 inches, a road 6 to 8, a heavy-truck road more. Place and compact in lifts of no more than 3 to 4 inches.

Compaction Allowance

Loose dense-graded base loses 15 to 25 percent of its volume when rolled, so you order extra. Twenty percent is a safe middle.

Density

Loose road base is about 1.5 tons per cubic yard, with a range of roughly 1.2 to 1.5 by rock and gradation. Use the supplier figure when you have it.

Subgrade Strength

A soft or wet subgrade needs a thicker base or a geotextile, which changes the quantity and is a design decision beyond this estimate.

Moisture

Wet material weighs 10 to 15 percent more, so a weigh-ticket can read heavier than the dry estimate.

Road Base Classes Comparison

DOTs use different names for the same dense-graded aggregate base.

ClassWhere usedDensity (ton/yd3)Notes
Class 2 aggregate baseCalifornia1.5Requires 95 percent relative compaction
Class 5 aggregate baseMinnesota1.5Common road and driveway base
#21A / crusher runVirginia and mid-Atlantic1.5Dense-grade base
ABC (aggregate base course)Carolinas1.5Road base
Dense-grade aggregate (DGA)Northeast1.5Base and subbase

They differ in the exact gradation and local spec, not much in density. The class is a gradation name, not a compaction factor; the required compaction is set by the project spec.

When to Use a Road Base Calculator

Private Roads and Lanes

Size the aggregate base for a new private road, farm lane or long driveway.

Driveways

Figure the compacted base under a gravel, asphalt or concrete driveway.

Building Pads

Estimate the base under a slab, shop or pole-barn floor.

Parking Areas

Work out the base for a parking pad or equipment yard, then plan a surface with the paver calculator.

Checking a Delivery

Compare a weigh-ticket in tons against the area, finished depth and allowance you used.

Common Road Base Mistakes

1. Ordering the Compacted Volume

Loose base shrinks when rolled. Ordering only the finished volume leaves it thin. Add a compaction allowance.

2. Thick Lifts

A single deep lift will not compact through. Place and roll in 3 to 4 inch lifts.

3. Treating the Allowance as a Spec

The 20 percent allowance is for ordering, not a compaction target. A real road is tested to 95 percent relative compaction.

4. Ignoring the Subgrade

A soft subgrade pumps through a thin base. Fix or stabilize it, or thicken the base.

5. Using a Clean Stone

Open-graded #57 does not bind. A base needs dense-graded aggregate with fines to lock up.

6. Mixing Feet and Inches

Depth is in inches. A 6 inch base is 6, not 0.5.

Accuracy and Limitations

The calculator estimates the loose tons to order from area, finished depth, density and a compaction allowance.

What it calculates

  • Compacted cubic yards from area and depth
  • Base tons and loose tons to order
  • The compaction allowance added
  • Coverage per ton at the finished depth

What it does not cover

  • A 95 percent relative-compaction spec
  • Subgrade design and geotextile
  • Pavement thickness design
  • Delivery, labor and pricing

How We Estimate Road Base

Method
Cubic yards = area x depth / 324; base tons = yd3 x density; loose tons = base x (1 + compaction%).
Inputs used
Area, finished depth, base class, optional density override and a compaction allowance.
Defaults
Density 1.5 ton/yd3 (loose), compaction allowance 20 percent.
Compaction
Dense-graded base loses 15-25% loose volume when rolled; allowance is for ordering, not a spec.
Data basis
Aggregate-supplier data, Inch Calculator density reference and DOT base practice (e.g. CA Class 2).
Not included
Relative-compaction testing, subgrade and pavement design, delivery, labor and pricing.
Sources
See the Sources list below.
Last reviewed
2026-11-05.

Frequently Asked Questions About Road Base

How much road base do I need?

Multiply the area by the finished depth in inches, divide by 324 for cubic yards, multiply by about 1.5, then add a compaction allowance. A 1,000 sq ft road at 6 in is about 27.8 base tons, roughly 33 tons loose with 20 percent.

How many tons is a cubic yard of road base?

About 1.5 tons per cubic yard loose, with a range of roughly 1.2 to 1.5 by rock and gradation. Suppliers sell by the loose ton.

What is road base?

Dense-graded crushed stone with fines that interlock and compact into a load-bearing base under a road, driveway or slab. DOTs call it Class 2, Class 5, #21A or aggregate base course.

How much extra road base for compaction?

Loose dense-graded base loses 15 to 25 percent of its volume when rolled, so order about 20 percent extra to reach the finished depth.

How deep should a road base be?

About 4 inches under a driveway and 6 to 8 inches under a road, placed and compacted in lifts of no more than 3 to 4 inches. Heavy-truck roads need more.

Is road base the same as crusher run?

Essentially yes. Road base, Class 2, Class 5, ABC and crusher run are dense-graded aggregate bases with regional names and gradations. All compact into a load-bearing layer.

What is Class 2 aggregate base?

A California DOT dense-graded base aggregate with a required gradation, placed and compacted to at least 95 percent relative compaction. Class 5 and ABC are the equivalents in other states.

How much does a ton of road base cover?

At 1.5 tons per cubic yard and 6 inches deep, a ton covers about 36 square feet of finished base. Coverage is 324 divided by the density times the depth.

Does the calculator meet a compaction spec?

No. The allowance is a rule of thumb for ordering extra material. A real base is governed by a project or DOT spec, usually 95 percent relative compaction verified by testing.

Is my data saved?

No. The calculator runs entirely in your browser and nothing is stored or sent.

Sources

Related Calculators

Building a road or driveway base?

Explore all framing calculators

Tonnage is a planning estimate. Road base is sold by the loose ton, and its density varies with the rock and moisture, so deliveries can differ 10 to 20 percent. The compaction allowance here is a rule of thumb for ordering extra loose material, not a compaction specification. A real road or driveway base is governed by a project or DOT spec, commonly 95 percent relative compaction verified by testing. Confirm the gradation, density and required compaction with your supplier and engineer. Spotted an error? Let us know.