Do Sonotubes Need a Footing at the Bottom?

Do sonotubes need a footing at the bottom, or is the tube enough? Sonoco and the 2021 IRC speak to this in different words, and the code text never mentions tubes. The sonotube volume calculator counts only the concrete inside the tubes, so the footing question sits with your building official.

Quick Answer

Sonoco sells its tube as a concrete form and says it is not designed to carry structural loads. The 2021 IRC sizes deck footings by load and soil, and its text never mentions tubes. Your building official decides what counts as the footing at your site.

Do Sonotubes Need a Footing? What the Manufacturer Says

Sonoco treats the tube as a form: its FAQ says Sonotubes “are not designed to carry structural loads.” The same FAQ says pier depth is set by local building codes, with the base generally deeper than the frost line and in contact with firm, undisturbed soil.

It names the building codes inspector or a licensed structural engineer as the people to check with. For tube size, tube base and rebar, Sonoco says the answer depends on the full structure design, the soil and local codes, and that a licensed engineer or architect must provide it.

Sonoco also sells a separate Tube Base footing form. Its 2016 products brochure says the form is used with Sonotube forms for added strength, increased stability and greater bearing capacity, and lists decks, porches and posts as uses. No source read for this article compares a tube pier on undisturbed soil with one on a poured pad, so that comparison is not stated.

Schematic of a tube-formed pier above a wider footing A not-to-scale cross-section. A round column formed by a tube rises above the ground surface and continues into the soil. At its bottom sits a wider footing, sized for load and soil, resting on undisturbed soil. No dimensions are shown. Schematic only, not to scale Round column formed by the tube Ground surface Undisturbed soil Wider footing, sized for load and soil
Schematic, not to scale: a round column above a wider footing, set in soil.

What Does the 2021 IRC Say About Footings?

The 2021 IRC sizes footings by load and soil, and the text read for this article never uses the word tube. Section R403.1.1 says the size of footings supporting piers and columns is based on the tributary load and the allowable soil pressure in Table R401.4.1.

Section R403.1.4 puts exterior footings at least 12 inches below the undisturbed ground surface and sends deck footings to Section R507.3. Section R403.1.4.1 says piers and other permanent supports must be protected from frost by listed methods, including extending below the frost line in Table R301.2. It also says footings may not bear on frozen soil unless the frozen condition is permanent.

The text does not say whether a poured tube alone counts as a footing. That question belongs to your building official. For footing depth in general, see how deep footings should be.

How Big Is a Deck Footing Under the 2021 IRC?

Table R507.3.1 sizes a deck footing by tributary area and allowable soil bearing, so the footing grows as the load grows. Section R507.3 says decks sit on concrete footings, or other approved structural systems, designed for all loads, with footings sized to carry the imposed loads to the ground.

Three cells from the table for 1,500 psf soil and a 40 psf live or ground snow load: 20 sq ft of deck needs a 12 in round footing 6 in thick; 40 sq ft needs 16 in and 6 in; 160 sq ft needs 31 in and 11 in. The table allows interpolation but not extrapolation. Check the table in your adopted code before relying on any figure.

As arithmetic from those cells, a tube with a 12 in nominal diameter matches only the 20 sq ft case. Sonoco says nominal means the inside diameter is at least the stated size and may be up to 1 in larger. Section R507.3.2 sets deck footings at least 12 inches below undisturbed ground, and R507.3.3 adds frost protection where a deck attaches to a frost-protected structure.

Round footing diameter by deck area, 2021 IRC Table R507.3.1 Drawn at 15 pixels per inch. A 12 in nominal tube reference bar is 180 pixels. For 1,500 psf soil and a 40 psf load, 20 sq ft of deck needs a 12 in round footing (180 pixels), 40 sq ft needs 16 in (240 pixels) and 160 sq ft needs 31 in (465 pixels). Round footing diameter, Table R507.3.1 (1,500 psf soil, 40 psf load) Scale: 15 px per inch 12 in nominal tube (reference) 12 in 20 sq ft of deck: 12 in round, 6 in thick 12 in 40 sq ft of deck: 16 in round, 6 in thick 16 in 160 sq ft of deck: 31 in round, 11 in thick 31 in
Three table cells at one scale (15 px per inch), with the 12 in tube as a reference bar.

What Does DCA 6 Add, and Which Edition Is It?

DCA 6, the American Wood Council deck guide, shows a narrower concrete stem on a larger footing as an accepted option, but the copy read here is based on the 2015 IRC. Its commentary says Figure 12 includes an option with a 12 in diameter concrete stem to reduce the concrete required.

The guide says footings bear on undisturbed soil at least 12 inches down or below the frost line, whichever is deeper. It adds that the building official verifies bearing conditions in the field before concrete is placed. Its Table 4 lists round footings from 18 in to 42 in across its rows, under its own 2015 assumptions of 40 psf live load and 1,500 psf soil.

Do not read those sizes against the 2021 table. A newer DCA 6 edition may exist: not verified.

What each source says about footings and bearing
Source What it says about the footing or bearing Edition or date
Sonoco Sonotube FAQ Pier depth set by local codes; base on firm, undisturbed soil; tubes not designed to carry structural loads Undated
Sonoco Builder’s Tube sheet Designed for below-ground placement; states no footing depth or bearing requirement 2016
Sonoco products brochure Tube Base footing form adds bearing capacity 2016
2021 IRC, R403 and R507 Footing sized by load and soil; deck footings at least 12 in below undisturbed ground 2021 edition
AWC DCA 6 Building official verifies bearing before concrete; 12 in stem option shown 2015-based edition

Should the Tube Stay in the Ground?

Sonoco gives two different statements, one for each product, so follow the instructions for the tube you buy. Its Builder’s Tube sheet says the form is “designed to be left in place” and is not designed to be stripped; a release agent is needed if stripping is wanted.

The Sonotube FAQ says below-grade forms need no stripping unless local code requires it, and that removal is general practice for exposed columns. The same FAQ also calls the forms temporary, single-use concrete forms to be removed before project completion. Your local code and inspector settle which applies.

Does the Sonotube Calculator Count a Footing?

No, the calculator counts the concrete inside round tubes only, and its FAQ says it adds no footing or flare. The tool page points to the concrete bell pier calculator for a flared footing and the concrete footing calculator for footings under piers.

Here is the tool’s default case, as arithmetic only: 4 tubes, 12 in across, 4 ft long, 10% waste.

  1. One tube. 3.1416 x 0.5 ft x 0.5 ft x 4 ft = 3.14 cu ft.
  2. Four tubes. 3.1416 x 4 = 12.57 cu ft.
  3. Add 10% waste. 12.57 x 1.1 = 13.82 cu ft.
  4. Cubic yards. 13.82 / 27 = 0.51 cu yd.
  5. 80 lb bags. At the tool’s 0.60 cu ft per bag, 13.82 / 0.60 = 23.04, rounded up to 24 bags.

None of those numbers includes a footing under any tube. Estimate that separately.

Who Decides the Footing at Your Site?

Your building official decides, using the code edition your area has adopted. The 2021 IRC is a model code, so local amendments and the local frost depth apply, and the inspector approves the footing before concrete is placed.

Sonoco and DCA 6 both point to the same person: Sonoco says to check with the building codes inspector, and DCA 6 says the building official verifies bearing before the pour. Ask the department these questions:

  • Which code edition and local amendments apply to my deck?
  • What is the local frost depth?
  • What footing size does the table give for my tributary area and soil bearing?
  • Is a tube-formed pier with no wider base accepted? The IRC text is silent.
  • Is a footing form such as Tube Base accepted? The IRC does not mention it.
Who decides the footing Three boxes joined by arrows. First, the 2021 IRC model code sizes the footing by load and soil. Second, your jurisdiction sets the adopted edition, amendments and frost depth. Third, the building official approves the footing before concrete is placed. Model code, 2021 IRC Sizes the footing by load and soil → Your jurisdiction Adopted edition, amendments, frost depth → Building official Approves the footing before concrete Sonoco and DCA 6 also point to the building codes inspector or official.
Three steps in order: model code, local rules, official approval.
Count the concrete inside your tubes

Enter your tube size, height and count in the tube concrete volume tool, then estimate the footing separately. More tools sit in the foundations and footings calculators.

FAQs About Sonotube Footings

Can a Sonotube carry a load by itself?

No. Sonoco says Sonotubes are not designed to carry structural loads. A licensed engineer or architect should pick sizes.

Does the IRC mention Sonotubes?

No. The 2021 IRC text read for this article never uses the word tube. Section R507.3 asks for deck footings sized to carry the loads, and your building official decides how that applies to a poured tube.

How deep must a deck footing be?

The 2021 IRC, in R507.3.2, says at least 12 inches below undisturbed ground. R507.3.3 adds frost protection where the deck attaches to a frost-protected structure. Local frost depth and amendments decide.

What is a Tube Base?

It is a footing form that Sonoco’s brochure describes for use with Sonotube forms, for added strength, stability and bearing capacity. The 2021 IRC does not mention it, so your inspector decides whether to accept it.

Does the sonotube calculator include a footing?

No. It counts the volume inside round tubes only. Its own FAQ says it adds no footing or flare, so estimate that part separately.

Should the tube stay in place after the pour?

Sonoco says Builder’s Tube is designed to be left in place. Its FAQ says below-grade Sonotube forms need no stripping unless local code requires it, though it also calls them single-use.

Who approves the footing?

The building official. The 2015-based edition of DCA 6 says the official verifies bearing conditions in the field before concrete is placed. Ask your department which code edition and frost depth apply.

Sources and Further Reading

References Used in This Article

This article reports what Sonoco, the 2021 IRC and a 2015-based DCA 6 edition say, not a design for your pier. Your building department decides the footing for your pier, so ask before you pour. Reviewed for accuracy by Prof. Dr. Khalil Mudassar, PhD. Last updated 2026-10-20.