Does Fiber Mesh Replace Rebar?

Can fiber mesh do the job of rebar in a slab? Many pour plans raise that question, and the two readable sources on this page speak to only part of it.

Quick Answer

Neither readable source says fiber mesh replaces rebar. ACI FAQ 927 says fiber-reinforced concrete is designed using ACI 544.4R, and it does not compare fibers with bars or welded wire. ASTM C1116 names four fiber types but does not rank them. The question needs a design review for your slab.

What the ACI FAQ Actually Says

ACI FAQ 927 answers one narrow question: how fiber-reinforced concrete is designed. Its answer points to ACI 544.4R for structural design. For specific uses, it names ACI Committees 239 and 360, including slabs-on-ground.

The FAQ does not say how fibers compare with reinforcing bars or welded wire fabric. Read it as a pointer to design guides, not as a design rule. Once you have a dose in mind, the fiber mesh dosage calculator works out the bag count.

Which Fiber Types ASTM C1116 Names

ASTM C1116/C1116M-23, titled Standard Specification for Fiber-Reinforced Concrete, names four fiber types in its abstract. Each type is named by fiber material. The abstract does not rank the types, so none is presented here as better or worse.

ASTM C1116 fiber types Four equal blocks in a row, listed in ASTM C1116 type order without ranking. Type I is steel fiber concrete with stainless, alloy, or carbon steel fibers. Type II is glass fiber concrete with alkali-resistant glass fibers. Type III is synthetic fiber concrete. Type IV is natural fiber concrete that contains cellulose fibers. Fiber types named in the ASTM C1116 abstract Type I Steel Stainless, alloy, or carbon steel Type II Glass Alkali-resistant glass fibers Type III Synthetic Synthetic fibers Type IV Natural Cellulose fibers
The four types in the order the abstract lists them.

The four types are these:

  • Type I covers steel fiber concrete with stainless, alloy, or carbon steel fibers.
  • Type II covers glass fiber concrete with alkali-resistant glass fibers.
  • Type III covers synthetic fiber concrete.
  • Type IV covers natural fiber concrete that contains cellulose fibers.

What the Two Sources Cover and Miss

The table lists the main topics against each readable source. A “Not discussed” cell means the readable text does not address that topic. It does not mean the topic is absent from the standard or the guide.

Topics covered by the two readable sources
Topic ACI FAQ 927 ASTM C1116 abstract and scope
Design basis Design follows ACI 544.4R Not discussed
Slab guidance Points to ACI Committees 239 and 360 Not discussed
Fibers versus steel bars or welded wire Not discussed Not discussed
Placement and curing Not discussed Scope excludes placement, consolidation, curing, and protection after delivery

The scope exclusion matters for curing. The specification does not cover placement, curing, or protection after delivery. For the water side of curing, read our guide on curing new concrete.

How Much Fiber 10 Cubic Yards Needs

Take an example pour of 10 cubic yards dosed at 1.5 pounds per cubic yard. The total is 10 x 1.5 = 15 pounds of fiber. At 1.5 pounds per bag, 15 divided by 1.5 is 10 bags.

This dose is an arithmetic example, not a recommended dose. Your project specification sets the real dose.

15 pounds of fiber as 10 bags Ten equal blocks in a row, one per bag, each labeled 1.5 lb. Together they total 15 lb. The example pour is 10 cubic yards at 1.5 lb per cubic yard, which gives 15 lb, and at 1.5 lb per bag that is 10 bags. 10 bags at 1.5 lb each 1.5 lb 1.5 lb 1.5 lb 1.5 lb 1.5 lb 1.5 lb 1.5 lb 1.5 lb 1.5 lb 1.5 lb 10 bags x 1.5 lb = 15 lb of fiber Example pour: 10 cubic yards at 1.5 lb per cubic yard
Ten bags of 1.5 pounds each make the 15 pound total.

Where the Code Position Stands

The code position was not verified. ACI FAQ 927 names ACI 544.4R as the design method, but this article did not read the 2018 text of that guide. It makes no claim about what the guide says on fibers and bars.

Whether a building code adopts ACI 544.4R was not checked either. Check the code text that governs your project before relying on any design method.

A Planning Question Before You Choose

Ask whether the slab must carry load or mainly control cracking. This is a planning question, not a code rule. The two readable sources do not answer it for a specific slab.

Planning question for fiber or bars A decision flow that starts with the question whether the slab must carry load. A yes branch leads to a design review under ACI 544.4R, which this article did not read. A no branch leads to a crack-control check of the fiber specification. The flow is a planning question, not a code rule. Must the slab carry load? Planning question Yes No Design review first ACI 544.4R, not read here Crack-control check Compare the fiber spec for your mix Planning question only. Not a code rule.
The decision starts with load, not with the fiber price.

A yes answer sends the decision to a design review under ACI 544.4R, which this article did not read. A no answer still calls for a check of the fiber specification against your mix.

Work out the bag count

The fiber mesh dosage calculator handles the dose and bag count for your own volume. Choosing between fiber and steel bars still needs a design review.

FAQs About Fiber Mesh and Rebar

Does fiber mesh replace rebar?

Neither readable source says so. ACI FAQ 927 points to ACI 544.4R for design and does not compare fibers with bars. A design review is needed for any specific slab.

Which fiber types does ASTM C1116 name?

ASTM C1116 names four types: steel, alkali-resistant glass, synthetic, and natural fiber concrete that contains cellulose. The abstract lists them without ranking them.

Does ASTM C1116 cover placing and curing?

No. The scope excludes placement, consolidation, curing, and protection after delivery. Curing still needs a plan of its own, and the water side is covered in a separate guide.

What does ACI FAQ 927 say about design?

It says fiber-reinforced concrete is designed using methods in ACI 544.4R. It names ACI Committees 239 and 360 for specific uses, including slabs-on-ground.

How many bags is 15 pounds of fiber?

At 1.5 pounds per bag, 15 pounds is 10 bags. The example uses 10 cubic yards at 1.5 pounds per cubic yard, which is an arithmetic example, not a recommended dose.

Did this article read the 2018 ACI 544.4R?

No. The full text of the 2018 ACI 544.4R was not read, so this article makes no claim about that guide’s position on fibers and bars.

Does fiber mesh change curing needs?

The ASTM C1116 scope leaves curing out, so the specification does not address it. Curing still needs a plan of its own, and the guide on curing new concrete covers the water side.

Sources and Further Reading

References Used in This Article

The ACI FAQ and ASTM abstract named in Sources are the only readable sources for this page. ACI 544.4R’s full text and the code position were not read. Reviewed for accuracy by Prof. Dr. Khalil Mudassar, PhD. Last updated 2026-11-11.