How big is a Class III stone? Ask three agencies and you get three answers, because each one measures rock a different way. This guide lays out rip rap sizes from federal manuals and two state specs, each figure tied to its source.
FHWA’s HEC-23 (2009) lists ten riprap classes, from Class I (nominal d50 6 in, about 20 lb) to Class X (42 in, 3 tons). The largest allowed stone in each class is twice the nominal d50. FHWA manuals set layer thickness at the greater of D100 or 1.5 x D50, at least 1 ft.
What Are the Standard Rip Rap Sizes?
The most widely used federal set is the ten classes in FHWA’s HEC-23 Volume 1 (2009), a bridge scour design manual. Each class is named for its median stone size, d50: half the rock, by weight, is smaller than that size.
Class I has a nominal d50 of 6 in, and Class X has 42 in. In every class, HEC-23 sets the largest allowed stone (d100 max) at exactly twice the nominal d50. The tables came from NCHRP Project 24-23 and assume a specific gravity of 2.65.
HEC-23 tells designers to round up to the next larger class. A design that needs a d50 of 16.8 in gets Class V, with its 18 in nominal d50. The rip rap tonnage calculator offers d50 options of 6, 9, 12, 18 and 24 in. Treat those as tool settings, not a state class list.
How Heavy Is Each Riprap Class?
HEC-23 gives each class a nominal median weight (W50), from 20 lb for Class I to 3 tons for Class X. The heaviest allowed stone (W100 max) runs from 140 lb to 48,200 lb.
| Class | Nominal d50 | d100 max | Nominal W50 | W50 range | W100 max |
|---|---|---|---|---|---|
| I | 6 in | 12 in | 20 lb | 15-27 lb | 140 lb |
| II | 9 in | 18 in | 60 lb | 51-90 lb | 470 lb |
| III | 12 in | 24 in | 150 lb | 120-210 lb | 1,100 lb |
| IV | 15 in | 30 in | 300 lb | 240-420 lb | 2,200 lb |
| V | 18 in | 36 in | 1/4 ton | 410-720 lb | 3,800 lb |
| VI | 21 in | 42 in | 3/8 ton | 650-1,150 lb | 6,000 lb |
| VII | 24 in | 48 in | 1/2 ton | 950-1,700 lb | 9,000 lb |
| VIII | 30 in | 60 in | 1 ton | 1,900-3,300 lb | 17,600 lb |
| IX | 36 in | 72 in | 2 ton | 3,300-5,800 lb | 30,400 lb |
| X | 42 in | 84 in | 3 ton | 5,200-9,200 lb | 48,200 lb |
Those weights depend on rock density. HEC-23 Volume 1 states, “Typically, a minimum allowable specific gravity of 2.5 is required for riprap applications.” Washington State DOT’s 2027 Standard Specifications (M 41-10) require at least 2.55. The USACE manual EM 1110-2-1601 says stone generally weighs 150 to 175 pcf and advises designing near the low end when the quarry is unknown.
Density matters more than it looks. Per the same manual, a 10 percent change in unit weight moves the weight limits 70 percent and the thickness about 20 percent.
Each class is also a range, not one size. HEC-23 targets a d85/d15 ratio of 2.0, with 1.5 to 2.5 allowed. USACE standard gradations run 1.4 to 2.2, with quarry-run stone limited to 7. NCDOT’s 2012 specifications require no specific gradation, only an even spread of sizes. No more than 5.0 percent may fall under the minimum, or 10.0 percent over the maximum.
Why Does Size Mean Something Different at Each Agency?
Each document measures a stone differently, so equal numbers do not mean equal rock. HEC-23 uses the intermediate axis, USACE and HEC-11 use an equal-weight sphere, North Carolina uses the long dimension, and Washington averages three axes.
| Source and context | How size is measured | How classes are named | Example |
|---|---|---|---|
| FHWA HEC-23 (2009), federal design manual | Intermediate (B) axis; weight = 0.85 x unit weight x d cubed (85 percent of a cube) | Class I to X by nominal d50 | Class III: d50 12 in, 150 lb |
| FHWA HEC-11 (1989, archived) and USACE EM 1110-2-1601 (1991, Change 1 1994), design manuals | Diameter of a sphere of the same weight | HEC-11: Facing, Light, then 0.23 to 1.81 metric ton; USACE: by D100 max, 9 to 54 in | HEC-11 Facing: D50 0.29 m (about 11.4 in, our conversion) |
| NCDOT 2012 Section 1042, North Carolina highway spec | Long dimension of each stone | Classes A, B, 1 and 2, with minimum, midrange and maximum sizes | Class 1: 5, 10 and 17 in |
| WSDOT 2027 M 41-10 Section 9-13.4, Washington highway spec | (Length + width + thickness) / 3 | Scour rock Classes A to D | Class A: 100 percent passing 18 in |
Here is why it matters, in our arithmetic. One 150 lb stone at specific gravity 2.65 measures about 12.3 in on HEC-23’s B-axis basis. The same stone works out to about 14.4 in as a USACE or HEC-11 sphere.
Class labels collide too. HEC-23 Class I is a 6 in d50. NCDOT’s 2012 Class 1 runs 5 to 17 in by long dimension. The example Class 1 in FHWA’s HEC-14 (2006), taken from the Federal Lands Highway Division, has a 5 in D50. Always read the class table in the spec your project names.
How Thick Should a Rip Rap Layer Be?
The federal rule is the greater of the D100 stone’s spherical diameter or 1.5 times the D50’s. HEC-23 Volume 2 (2009), HEC-11 (1989) and the USACE manual all state it. The two FHWA manuals add a minimum of 1 ft (300 mm in HEC-11).
With HEC-23 classes, the D100 test usually wins. Using the table’s d100 max (twice d50), Class III comes to 24 in, not 18 in (our arithmetic). HEC-23 Volume 2 does not say outright whether the rule means the d100 max, so ask your engineer which value applies.
Some settings call for more stone:
- Underwater. HEC-23 Volume 2, HEC-11 and USACE add 50 percent. USACE notes one Missouri River District cut this to 1.25 times the dry thickness using divers and sonic sounders.
- Waves. HEC-23 Volume 2 Design Guideline 17 uses 2.0 x d50 or d100, whichever is greater. Its Class VIII example has a 60 in layer.
- Culvert outlets. In FHWA HEC-14 (2006), example apron depths run from 3.5 x D50 for the smallest stone down to 2.0 x D50.
- Debris, ice and boat wakes. HEC-11 adds 150 to 300 mm (about 6 to 12 in, our conversion), with larger stone.
The WSDOT 2027 specifications leave thickness to the plans, with a 12 in tolerance for loose riprap.
Do You Need a Filter Under Rip Rap?
Usually, yes. Per HEC-23 Volume 1 and HEC-11, a filter keeps fine soil from washing out between the stones. It also spreads the armor’s weight and relieves water pressure.
HEC-23 sets a granular filter at 4 times the d50 of the filter stone or 6 in, whichever is greater, plus 50 percent underwater. HEC-11 gives 150 to 380 mm (about 6 to 15 in) for a single-layer blanket. Where dune-type bedforms may form in floods, HEC-23 strongly recommends considering only a geotextile filter.
Fabric has trade-offs. HEC-11 lists hard underwater placement, sun exposure, unproven long-term life and soil migrating downslope beneath fabric under wave action. HEC-23 adds that most riprap geotextiles float (specific gravity 0.90 to 0.96) unless anchored. The USACE manual leaves filter design to the District geotechnical branch.
How Many Tons of Rip Rap Does a Bank Need?
Multiply area by thickness to get cubic yards, then multiply by a placed density to get tons. Both units are used for payment. HEC-11’s suggested spec measures riprap by the cubic yard in place; WSDOT pays loose riprap by the ton or the cubic yard.
No source we read gives a placed density for riprap. Solid rock at specific gravity 2.65 weighs about 165.4 lb per cubic foot, or 2.23 tons per cubic yard (our arithmetic). Placed rock has gaps, so ask your quarry for its figure.
- Tool default. 500 sq ft at 18 in: 500 x 18 / 324 = 27.78 cu yd. At the tool’s 1.5 tons per cu yd, that is 41.67 tons; with its 10 percent overage setting, 45.83 tons. Both numbers are tool settings, not source figures.
- Sample bank at 18 in. A bank 40 ft long with a 15 ft slope length covers 600 sq ft. HEC-23 Class III at 1.5 x d50: 600 x 18 / 324 = 33.33 cu yd, or 50.0 tons at 1.5.
- Same bank at 24 in. With the D100 rule: 600 x 24 / 324 = 44.44 cu yd, or 66.67 tons. That is 16.67 tons, one-third more stone.
The thickness rule changes the order by a third, so settle it with your engineer before you price stone. The 324 converts square feet times inches into cubic yards (12 x 27).
Enter your bank area, class and thickness in the Rip Rap Calculator, then confirm the class, layer and density with your engineer, state spec and quarry.
FAQs About Rip Rap Sizes
What size is Class III rip rap?
Under FHWA HEC-23 (2009), Class III has a nominal d50 of 12 in and a nominal median weight of 150 lb. Its largest allowed stone is 24 in. Other agencies use similar labels for different stone.
Is a 12 inch rip rap layer thick enough?
Only for small stone. HEC-23 Volume 2 sets 1 ft as the minimum. The layer must also reach the D100 stone or 1.5 times the D50, whichever is greater.
Why do two specs list different sizes for the same rock?
They measure different things. HEC-23 uses the intermediate axis, USACE and HEC-11 use an equal-weight sphere, NCDOT’s 2012 spec uses the long dimension, and WSDOT averages three axes.
What is the heaviest standard riprap class?
HEC-23 Class X is the largest, with a nominal d50 of 42 in and a nominal median weight of 3 tons. Its largest allowed stone is 84 in and 48,200 lb.
Does rip rap need fabric underneath?
It usually needs a filter, either granular stone or geotextile. HEC-23 strongly recommends geotextile alone where flood dunes may form, while HEC-11 warns that soil can migrate downslope under fabric with wave action.
How much thicker should rip rap be underwater?
HEC-23 Volume 2, HEC-11 and the USACE manual all add 50 percent for underwater placement. USACE notes one Missouri River District cut this to 1.25 times the dry thickness using divers and sonic sounders.
Is rip rap sold by the ton or the cubic yard?
Both. HEC-11’s suggested spec measures riprap by the cubic yard in place, and WSDOT’s 2027 spec pays loose riprap by the ton or the cubic yard. Ask your supplier for a placed density to convert.
Sources and Further Reading
References Used in This Article
- FHWA, HEC-23 Volume 1, Bridge Scour and Stream Instability Countermeasures, Third Edition (FHWA-NHI-09-111, 2009), accessed 2026-11-15.
- FHWA, HEC-23 Volume 2, Design Guidelines (FHWA-NHI-09-112, 2009), read from the Kentucky Transportation Cabinet copy, accessed 2026-11-15.
- FHWA, HEC-11, Design of Riprap Revetment (1989, archived metric version), accessed 2026-11-15.
- USACE, EM 1110-2-1601, Hydraulic Design of Flood Control Channels (1991, Change 1 1994), copy hosted by damfailures.org, accessed 2026-11-15.
- NCDOT, 2012 Standard Specifications, Section 1042 Rip Rap Materials (2012 edition), accessed 2026-11-15.
Figures come from the FHWA, USACE, NCDOT and WSDOT documents cited, read on 2026-11-15. Your engineer, local permits and state specs decide the class, thickness and filter for a real job. Reviewed for accuracy by Prof. Dr. Khalil Mudassar, PhD. Last updated 2026-11-15.

Shakeel Muzaffar is the Founder and Editor-in-Chief, with over 15 years of experience in digital publishing and online tool development. He oversees editorial quality and formula verification to ensure accurate, practical, and easy-to-use calculators.