How much stone does it take to swallow the rain from a roof? For a 1,000 sq ft roof and a 1 in storm, you need about 208 cu ft of stone pit at 40 percent voids. Knowing how to size a dry well means going further. The soil, the drain time and the setbacks decide whether that pit is allowed and whether it works.
To size a dry well, find the runoff volume and divide it by the stone void ratio to get the pit volume. Connecticut and Los Angeles use 40 percent voids. Then test the soil and apply a safety factor. Finally, confirm the well drains in time and meets groundwater and setback rules. Local codes decide the final numbers.
How to Size a Dry Well: The Five Inputs
Five things set dry well size: runoff volume, stone voids, the soil’s tested infiltration rate, drain time and location. The first two give you a pit volume. The last three decide whether that pit passes.
Runoff volume is the input step. Multiply the drainage area by the rain depth in feet and by a runoff coefficient (C). This guide uses C = 1.0, the default setting in our dry well sizing calculator, which runs the storage math in one step. The rules after that step come from regional manuals, and they do not agree.
| Rule | Connecticut (CT manual, Ch. 13) | Los Angeles (LA LID calculations) | Oregon (OSU EM 9200) |
|---|---|---|---|
| Stone void ratio | 40 percent | 40 percent | At least 30 percent |
| Stone size | Clean angular stone, 1.5 to 3 in | Washed gravel, 3/8 to 1 in | Not given in our source |
| Drain time | Fully dewatered within 48 hours | 48 hours at the surface, up to 96 hours below grade | 24 to 36 hours, or 72 hours |
| Design storm | Not given in our source | Larger of 0.75 in or the local 85th-percentile 24-hour depth | 1 in 24-hour storm is common; Portland uses the 10-year storm, Eugene the 5-year |
How Much Water Must the Dry Well Hold?
A dry well must hold the runoff from its design storm. For a 1,000 sq ft roof and 1 in of rain, that is 83.33 cu ft, or about 623 gallons. Here is the full storage math with the calculator’s default inputs.
- Runoff. 1,000 sq ft x (1 / 12) ft x 1.0 = 83.33 cu ft. At 7.48 gallons per cubic foot, that is 623.4 gallons.
- Pit volume. At 40 percent voids, 83.33 / 0.40 = 208.33 cu ft of stone pit, or 7.72 cu yd (208.33 / 27).
- Footprint. At 4 ft deep, 208.33 / 4 = 52.1 sq ft of pit.
The design storm changes everything downstream. Los Angeles sizes to the larger of a 0.75 in storm or the local 85th-percentile 24-hour depth. On the same roof, 0.75 in gives 1,000 x 0.75 / 12 = 62.5 cu ft. At 40 percent voids, that needs 156.25 cu ft of stone pit.
A round 52.1 sq ft pit is about 8.1 ft across (our arithmetic). The Portland drywells page says wells wider than 4 ft need a professional. OSU’s rule of thumb is one mini drywell per 500 sq ft, which would split this roof between two (our arithmetic).
How Do Stone Voids Change the Pit Size?
The void ratio sets how big you dig. At 40 percent voids, the pit must be 2.5 times the runoff volume, because only the gaps between stones hold water. Lower voids mean a bigger pit for the same storm.
Connecticut and Los Angeles both use 40 percent. OSU’s fact sheet asks for drain rock with at least 30 percent voids. At 30 percent, the 83.33 cu ft example needs 277.8 cu ft of pit, a third more than 208.33 cu ft (our arithmetic). Use the figure your local manual names.
Stone size differs too. Connecticut calls for clean angular stone of 1.5 to 3 in. Los Angeles calls for washed gravel of 3/8 to 1 in, in a flat-bottomed well with 2 to 8 ft of media.
The calculator also offers 0.35 for larger or graded stone and 0.90 for a chamber or crate. Those are tool settings, not figures from these sources. The chamber option counts only the chamber, while Connecticut calls for stone under and around the structure. The tool’s stone tonnage uses its own conversion factor, so ask your supplier for the real weight.
How Do You Test the Soil’s Infiltration Rate?
OSU Extension’s EM 9214 describes a falling-head test. Fill the test hole with about 6 in of water, time the drop, and divide the drop by the time. Its example, 6 in in 12 hours, works out to 0.5 in per hour.
- When not to test. Skip testing during rain, within 24 hours of more than 0.5 in of rain, or on frozen ground.
- How often. In the dry season, run the test 3 times. Test drywells at several depths, and for large areas run one test per 10,000 sq ft.
- Caution. OSU notes that Washington Ecology says perc and double-ring tests overestimate infiltration.
Next comes a safety factor. Los Angeles divides by 3 when a percolation or infiltration test and a geotechnical report back the design, and by 6 with only a boring. Applying LA’s factor of 3 to OSU’s example gives 0.5 / 3 = about 0.17 in per hour as a design rate. That is our arithmetic, mixing an Oregon example with an LA rule. The measured 0.5 in per hour clears LA’s 0.3 in per hour minimum. Portland’s drywells page wants a professional for soils under 2 in per hour. The Dry Well Calculator applies no safety factor.
How Fast Does a Dry Well Need to Drain?
The sources in this guide want a dry well empty within one to four days of the storm. The exact limit depends on where you live. A well that is still full when the next storm arrives has no room to store it.
- Connecticut: the well must fully dewater within 48 hours after the storm.
- Los Angeles: 48 hours for water at the surface, and up to 96 hours below grade.
- Oregon (OSU EM 9200): drain times of 24 to 36 hours, or 72 hours.
The calculator sizes storage only and runs no drawdown check. Pair its pit volume with a tested, factored infiltration rate, and confirm the drain time with your designer or local office.
How Deep Can a Dry Well Go?
Depth is capped by what sits below the well. Oregon DEQ, as cited by OSU, requires 5 ft of separation to seasonal high groundwater for roof runoff and 10 ft for other runoff. Portland’s drywells page also asks for at least 5 ft above groundwater and above rock or hardpan.
OSU also says to avoid sites with bedrock within 10 ft of the bottom, slopes over 10 percent, landslide areas and contaminated soil. Typical Oregon drywells run 2 to 20 ft deep. Connecticut requires at least 12 in of cover and a soil evaluation covering seasonal high groundwater, bedrock and infiltration rate. Portland wants the top of the well below nearby foundations.
Where Can a Dry Well Sit on Your Lot?
In Portland, Oregon, a dry well must sit at least 10 ft from buildings and 5 ft from property lines. The rule is BCG 17-10, which cites OPSC 1101.6.3 and Title 25.10. Closer placement needs approved testing and sizing plus geotechnical and structural reports.
OSU’s list of Portland setbacks adds 20 ft from cesspools and 500 ft from drinking water wells. Mini plastic wells need 8 ft from foundations. OSU also says to assume water spreads 1 ft sideways for every 1 ft it drops when setting setbacks. Connecticut bars dry wells under structures and caps the drainage area at 1 acre (5 acres in series).
Federal rules sit behind all of this. The US EPA treats stormwater drainage wells as shallow Class V wells that must not endanger underground sources of drinking water. Before you dig, check with your local building or stormwater office.
Enter your roof area, design rain and stone type in the Dry Well Calculator for runoff, pit volume and footprint. Then apply your local soil test, safety factor and drain-time rules.
FAQs About Sizing a Dry Well
How big should a dry well be for a 1,000 sq ft roof?
With 1 in of rain and full runoff, the roof sheds about 83.33 cu ft of water. At 40 percent stone voids, that needs about 208 cu ft of stone pit, before local soil and drain-time checks.
Does a dry well need a perc test?
A test earns a smaller safety factor. Los Angeles applies a factor of safety of 3 with a percolation or infiltration test plus a geotechnical report. With only a boring, it applies 6.
How long should a dry well take to drain?
It depends on the rulebook. Connecticut says 48 hours after the storm. Los Angeles allows 48 hours at the surface and up to 96 below grade. OSU lists 24 to 36 hours, or 72 hours.
How far does a dry well have to be from my house?
In Portland, Oregon, at least 10 ft from buildings and 5 ft from property lines. Other cities set their own distances, so ask your local building or stormwater office before you dig.
Can I put a dry well where the water table is high?
Only with enough separation. Oregon DEQ, as cited by OSU, wants 5 ft between the well and seasonal high groundwater for roof runoff, and 10 ft for other runoff.
Should I use 30 or 40 percent voids for drain rock?
Use the figure your local manual names. Connecticut and Los Angeles use 40 percent. OSU says drain rock should have at least 30 percent voids, which makes the same pit about a third larger.
Are dry wells regulated by the EPA?
Yes. The US EPA treats stormwater drainage wells as shallow Class V wells that must not endanger underground drinking water. Local codes add their own rules, so check with your local office.
Sources and Further Reading
References Used in This Article
- City of Los Angeles Bureau of Engineering, LID Sample Design Calculations (revised 2026-05-13), accessed 2026-11-15.
- Connecticut Stormwater Quality Manual, Chapter 13: Dry Well, accessed 2026-11-15.
- Oregon State University Extension, EM 9200: Drywells, accessed 2026-11-15.
- Oregon State University Extension, EM 9214: Infiltration Testing, accessed 2026-11-15.
- City of Portland, BCG 17-10: Drywell Location (revised 2024-05-29), accessed 2026-11-15.