Does a concrete block wall need a bond beam, and what goes inside one? The short answer starts with the construction: a horizontal course that is filled with grout and holds steel bars. Where one is required is a separate question, and this article cannot settle it.
A bond beam is a horizontal course in a concrete masonry wall. Builders fill it with grout and place horizontal reinforcing bars in it as the wall goes up. They make the course with bond beam units or by saw-cutting webs from standard block. Whether your wall needs one depends on your adopted code and an engineer’s design.
A Bond Beam Is a Horizontal Grouted Course
A bond beam is a horizontal course in a masonry wall that is filled with grout. CMHA TEK 03-02A notes that grout is used to fill bond beams. The same note says horizontal reinforcement can be placed in bond beam or lintel units as the wall is built.
Once you know the length, the Bond Beam Calculator estimates blocks, grout and rebar for one course.
Secondary source, not verified in full text. A search snippet of the TMS 402 masonry code describes a bond beam as a horizontal, sloped, or stepped element. The snippet says it is fully grouted, has longitudinal bar reinforcement and sits within a masonry wall. Code editions differ, so use the edition your jurisdiction adopts.
How Builders Construct a Bond Beam in Concrete Block
Builders make a bond beam course in one of two ways. They use bond beam units, which are made with reduced webs or knock-out webs. Or they saw-cut the webs out of a standard unit. CMHA lists both methods.
A knock-out web is removed before the unit is placed in the wall. The bars are placed as the wall is built, not added later as a separate step. For standard block dimensions, see our guide to concrete block sizes.
Where a Bond Beam Is Required Depends on Your Code
This article cannot state where a bond beam is required. The IRC and IBC bond beam text could not be read, so no placement rule is verified here. Check the code your jurisdiction adopts, and have an engineer confirm the design for your wall.
One trade article touches a related point. STRUCTURE magazine, in an article on an upcoming change to TMS 402 and 602, says that when shear reinforcement is required, the code calls for full grouting of the beam. That article discusses masonry beams in general, not bond beams by name, so treat it as a secondary source.
Spacing rules that appeared only in search snippets were not verified, so this article gives none.
Grout Confinement, Grout Stops and Low-Lift Limits
CMHA says grout can be confined to the desired grout area in one of two ways. You can use solid-bottom bond beam units. Or you can place plastic or metal screening, expanded metal lath or another approved material in the horizontal bed joint.
- Confine the grout. Use solid-bottom units or approved screening to hold grout where you want it.
- Skip bond-breaking grout stops. CMHA advises against roofing felt and other materials that break the bond between units and mortar.
- Mind the lift. CMHA describes building up to scaffold height or to a bond beam course, to a maximum of 5 ft. This is a construction note, not a design rule.
Cover distances for bars in concrete are a different topic. See our guide on rebar concrete cover for those values.
Estimating Blocks, Grout and Rebar for One Course
The Bond Beam Calculator counts blocks, grout and rebar for a course. The tool page’s own example uses a 20 ft course, one course, 16 in block, 0.19 cu ft of grout per block, 2 bars and 10 percent waste. The page shows 17 blocks, 2.85 cu ft of grout and 40 ft of rebar.
Here is the hand check, which matches those figures.
- Net blocks. A 16 in block is 1.3333 ft long, so 20 / 1.3333 = 15.0 net blocks. Same result: 0.75 blocks per foot x 20 ft = 15.
- Ordered blocks. 15 x 1.10 = 16.5, rounded up to 17 blocks.
- Grout. 15 x 0.19 = 2.85 cu ft, counted on the 15 net blocks.
- Rebar. 2 bars x 20 ft = 40 ft, with no waste added.
Grout is based on the 15 net blocks, not the 17 ordered. Grouting all 17 blocks would give 17 x 0.19 = 3.23 cu ft, which is 0.38 cu ft more than the page shows.
The page says course count, reinforcement and grout mix come from the structural design and local code. The 0.19 cu ft grout figure is the tool page’s own text, and no source for it was found. Confirm the numbers with an engineer.
Enter your length, block size, grout per block and bar count in the bond beam calculator to estimate blocks, grout and rebar.
FAQs About Bond Beams
What is a bond beam in a block wall?
A bond beam is a horizontal course in a masonry wall, filled with grout, that holds horizontal reinforcing bars. CMHA TEK 03-02A supports these points. A code snippet gives a similar definition that was not verified in full text.
How do builders put horizontal bars in a block wall?
Builders place the bars in bond beam units, or in standard block with the webs saw-cut out, as the wall is built. Some bond beam units have knock-out webs, which are removed before placement.
Do all block walls need a bond beam?
This article cannot say. No verified code text on bond beam placement was read. Check the code your jurisdiction adopts, and have an engineer confirm the design for your wall.
Is a bond beam the same as a lintel?
CMHA TEK 03-02A names both bond beam units and lintel units as places for horizontal reinforcement, so they are listed as separate options. A full comparison is a separate topic that this article does not cover.
Can I use saw-cut block instead of bond beam units?
Yes, according to CMHA TEK 03-02A. The note says horizontal reinforcement can be accommodated by saw-cutting webs out of a standard unit or by using bond beam units. Confirm the method with your engineer before building.
What should not be used as a grout stop?
Roofing felt and other materials that break the bond between masonry units and mortar should not be used, according to CMHA TEK 03-02A. Screening, expanded metal lath or another approved material can confine grout instead.
How many blocks and how much grout does a 20 ft bond beam need?
The worked example shows 15 net blocks, 17 with 10 percent waste, 2.85 cu ft of grout and 40 ft of rebar for one course. Enter your own inputs in the Bond Beam Calculator, and confirm them with an engineer.
Sources and Further Reading
References Used in This Article
- Concrete Masonry and Hardscapes Association, TEK 03-02A, Grouting Concrete Masonry Walls, accessed 2026-11-11. Primary technical note; CMHA-labeled copy, check the original before citing.
- STRUCTURE magazine, Upcoming Change to TMS 402/602, by Richard M. Bennett, accessed 2026-11-11. Trade article, secondary source; discusses masonry beams in general.
Placement rules for bond beams come from a masonry technical note and a trade article, not a code text. Check your local code and engineer’s requirements. Reviewed for accuracy by Prof. Dr. Khalil Mudassar, PhD. Last updated 2026-11-11.

Shakeel Muzaffar is the Founder and Editor-in-Chief, with over 15 years of experience in digital publishing and online tool development. He oversees editorial quality and formula verification to ensure accurate, practical, and easy-to-use calculators.