How much should a yard slope away from a house to keep rain off the foundation? The 2021 International Residential Code gives one clear number: 6 inches of fall in the first 10 feet. That is a 5 percent grade, more than double the 2 percent the same code sets for impervious surfaces.
The 2021 IRC, Section R401.3, says the ground must fall at least 6 inches within the first 10 feet from a foundation wall. That equals 5 percent, or 0.6 inch per foot. Hard, impervious surfaces within 10 feet need 2 percent. Where a lot line blocks that fall, drains or swales are required. Local codes can differ.
What Does the Building Code Say About Yard Slope Away From a House?
The 2021 International Residential Code (IRC) says the ground must fall at least 6 inches within the first 10 feet from a foundation wall. Section R401.3 states the goal in one line: “Lots shall be graded to drain surface water away from foundation walls.”
We read it on UpCodes, a third-party mirror, in Colorado’s unamended adoption, because the ICC site blocked our fetcher. Your state may adopt another edition or change the wording.
The same section sends surface water to a storm sewer or another approved collection point. A good slope is only half the job.
Here is the 6-inch rule in other units. These are our conversions, not code text.
- Percent: 6 inches over 120 inches is 0.05, or a 5 percent grade.
- Inches per foot: 0.6 inch of drop for each foot of run.
- Ratio and angle: 20 to 1, or about 2.86 degrees.
To test your own numbers, the elevation grade calculator converts any rise and run. It works in feet, so enter a 6-inch drop as 0.5.
What Happens When a Lot Line Leaves Less Than 10 Feet?
Where a lot line, wall or other barrier blocks 6 inches of fall within 10 feet, the 2021 IRC requires drains or swales instead. It is an exception for tight sites, not a free swap for grading.
A swale is a shallow channel shaped into the ground so water runs along it. The IRC text we read gives no slope for these swales. The 2 percent swale figure comes from a different code.
The 2021 International Building Code (IBC), Section 1804.4, says swales within 10 feet of a foundation must slope not less than 2 percent. An Orange County, California, policy shows the state building code using the same rule.
The DOE Building America Solution Center gives the swale channel a range of 2 to 4 percent. Below 2 percent, it says, water can pool. Above 4 percent, fast water can erode soil. Along a 40-foot swale, that means 9.6 to 19.2 inches of drop (our arithmetic).
How Much Should Walks and Patios Next to the House Slope?
Under the 2021 IRC, impervious surfaces within 10 feet of the foundation, such as walks and patios, need at least 2 percent slope away. That is 0.24 inch per foot, or 2.4 inches across 10 feet (our arithmetic).
The IBC, the California and Oregon restatements and the DOE all repeat 2 percent. The DOE notes that the 2009, 2012 and 2015 editions of the IRC used it too.
Virginia is the outlier we found. Its 2021 residential code keeps the 6-inch soil rule but lowers impervious surfaces to a minimum of 1.0 percent. That is only 1.2 inches over 10 feet.
The chart below lines up these minimums as inches of fall. For pitch details on the slab itself, see our separate guide to concrete patio slope.
Why Do Codes and Programs Give Different Numbers?
The numbers differ because states amend the model code, counties approve alternative methods, and programs such as ENERGY STAR set their own targets. Your local building department decides which version applies to your lot.
ENERGY STAR Single-Family New Homes, as cited by the DOE, asks for permeable surfaces sloped at least 0.5 inch per foot for 10 feet. That is 5 inches over 10 feet, about 4.17 percent, or one inch less than the IRC. Where the IRC is adopted, the code governs.
The IBC also has a relief clause. Where climate or soil conditions warrant, it lets the ground slope drop to 1 in 48, which it calls a 2 percent slope. The 2021 IRC text we read has no such reduction for the 6-inch rule.
Orange County, California, offers an alternative method. Soil may slope 2 percent, and impervious surfaces and swales 1 percent. All four conditions must hold:
- An approved geotechnical report rates the soil very low to medium expansion potential.
- The geotechnical foundation design accounts for moisture changes.
- Area drains sit no more than 20 feet apart, or 10 feet apart in side yards narrower than 10 feet.
- The civil engineer of record surveys and verifies the grading before the precise grading permit is finaled.
| Source | Soil next to the wall | Impervious within 10 ft | When space is short |
|---|---|---|---|
| 2021 IRC R401.3 (UpCodes mirror) | 6 in in first 10 ft (5 percent) | 2 percent | Drains or swales; no swale percent |
| 2021 IBC 1804.4 (UpCodes mirror) | 5 percent for 10 ft; 2 percent where climate or soil warrant | 2 percent | 5 percent to an approved alternative; swales at least 2 percent |
| Virginia 2021 R401.3 | 6 in in first 10 ft | 1.0 percent | Drains or swales |
| Oregon code, via Ashland | 6 in in first 10 ft | 2 percent | Drains, swales or other means |
| Orange County, CA alternative | 2 percent, with conditions | 1 percent, with conditions | Swales 1 percent; area drains |
Where Should Downspout Water Go?
Downspout water should land away from the foundation, but the sources set different distances. Your foundation type and your city decide which one applies.
- DOE, citing EPA Indoor airPLUS: drain to daylight at least 5 feet from the foundation. A drywell or other underground catchment must sit at least 10 feet away.
- NC State University: its Disconnect rainscaping fact sheet says at least 6 feet with a basement. With a crawl space or slab, it says 2 feet.
- City of Ashland, Oregon: policy BD-PP-0029 pipes roof drains underground to the City storm system. Splash blocks and drywells need the Building Official’s approval.
NC State adds cautions. Do not disconnect a downspout within 10 feet of a retaining wall or on steep slopes. Do not push water onto a neighbor’s property. Ashland also bars runoff from crossing a property line without proper approval.
The DOE calls a buried pipe pitch of 5/8 inch per foot a 5 percent slope. Our arithmetic gives about 5.21 percent.
How Do You Check the Slope and Keep It Over Time?
Measure the drop over the first 10 feet, convert it to feet, and read the fall per 10 feet. For soil beside the house, that output should read 6.0 inches or more under the 2021 IRC.
- Set the run. Mark a point 10 feet out, measured straight out from the face of the wall, as the IBC describes.
- Convert the rise to feet. A 6-inch drop is 0.5 feet; a 2.4-inch drop is 0.2 feet.
- Read the result. Rise 0.5 and run 10 give 5.00 percent, 2.86 degrees, 20.0 to 1 and 6.0 inches per 10 feet. That meets the IRC soil rule.
Watch the drainage check line. The calculator marks anything at 2 percent or more as meeting its drainage minimum, which is the IRC number for hard surfaces, not soil. Its first preset, 2 feet over 50 feet, shows 4.00 percent, 2.29 degrees, 25.0 to 1 and 4.8 inches per 10 feet. That passes the 2 percent check yet sits 1.2 inches short of the 6-inch rule. A 3 percent yard falls only 3.6 inches in 10 feet.
Grading also changes after the work is done. The IBC says the final ground level must account for additional settlement of the backfill. The DOE says to tamp the backfill to prevent later settling. ENERGY STAR allows two ways around tamping. A certified hydrologist, soil scientist or engineer can confirm non-settling soils. Or the builder can return for final grading after settling, such as after the first rainy season.
Before you regrade, ask your building department about permits. Your inspector, local utilities and any engineer on the job have the final word.
Enter your measured drop and distance in the GeniesMag rise-and-run grade calculator, then read the fall per 10 feet. For soil next to the house, look for 6.0 inches or more.
FAQs About Yard Slope Away From a House
Is a 2 percent slope enough for the lawn beside my house?
No, not under the 2021 IRC. Two percent is its minimum for impervious surfaces like walks. Soil next to the foundation should fall 6 inches in the first 10 feet, which is 5 percent.
How many inches per foot should the ground drop away from a foundation?
About 0.6 inch per foot meets the 2021 IRC rule of 6 inches in 10 feet. ENERGY STAR, as cited by the DOE, asks for at least 0.5 inch per foot over 10 feet.
What if the lot line is only 5 feet from my wall?
The 2021 IRC requires drains or swales where lot lines or other barriers block 6 inches of fall within 10 feet. Your local building department decides which design it accepts.
How steep should a drainage swale near a house be?
The 2021 IBC says swales within 10 feet of a foundation slope at least 2 percent. The DOE suggests 2 to 4 percent along the channel. The 2021 IRC gives no swale percentage.
How far from the house should a downspout empty?
The DOE, citing EPA Indoor airPLUS, says at least 5 feet, or an underground catchment at least 10 feet away. NC State says 6 feet for basements and 2 feet for crawl spaces or slabs.
Why should I recheck the grade after the first rainy season?
Because backfill settles. The IBC says final grading must account for that settlement. The DOE suggests tamping the backfill or returning for final grading after settling, for example after the first rainy season.
Can my state require a different slope than the IRC?
Yes. Virginia’s 2021 residential code lowers the impervious surface minimum to 1.0 percent, and Orange County, California, allows 1 percent under strict conditions. Your local building department and adopted code decide.
Sources and Further Reading
References Used in This Article
- UpCodes (third-party mirror, Colorado adoption without amendments): 2021 IRC Section R401.3 Drainage and 2021 IBC Section 1804.4 Site Grading, accessed 2026-11-15.
- UpCodes (third-party mirror): Virginia Residential Code 2021, Section R401.3 Drainage (state amendment), accessed 2026-11-15.
- Orange County (California) Public Works, Site Grading for Drainage Around Building policy (county handout, updated 2024-11-07), accessed 2026-11-15.
- City of Ashland, Oregon, Building Safety Division policy BD-PP-0029, Storm Water Drainage Systems (city handout), accessed 2026-11-15.
- US DOE Building America Solution Center (federal guides): Final Grade Slopes Away from Foundation; Swales, Drains, and Site Grading for Stormwater Control; Gutters and Downspouts, accessed 2026-11-15.
This guide summarizes code text and agency guides read on 2026-11-15; it is not engineering advice. Codes, amendments and inspectors vary by place. Reviewed for accuracy by Prof. Dr. Khalil Mudassar, PhD. Last updated 2026-11-15.

Shakeel Muzaffar is the Founder and Editor-in-Chief, with over 15 years of experience in digital publishing and online tool development. He oversees editorial quality and formula verification to ensure accurate, practical, and easy-to-use calculators.